Search:

Tag: 90k

Search: Search took 0.00 seconds.

  1. Attic Conversion - order of work?

    Started by Reno RSS Feed, 6th September 2009 03:30 PM
    90k, advice, afford, attic, bedroom, built, cottage, engineer, ensuite, existing, flooring, involve, joists, ladder, metal, moment, permanent, pop, pull, reasons, renovateforum.com, ripping, roof, space, staircase, strengthen, structural, thread, told, wide
    • Replies: 0
    • Views: 1,853
    Last Post: 6th September 2009 03:30 PM
    by Reno RSS Feed  Go to last post
Results 1 to 1 of 1