Hi,
I have a large rectangle room 10 metre's long x 7.5 metre's wide (the ceiling joist run across the 7.5m dimmension) which I am considering doing myself. What is the process for staggering the joints. I was going to start with a full sheet starting on one side of the room on and then on the next "run" start with a half sheet and so on. Like stretcher bond in bricklaying, is this the correct method.


Read the full thread at RenovateForum.com...