



Results 1 to 1 of 1
-
1st December 2008, 07:50 PM #1
Advice needed on overlay flooring installation.
HI im in the preocess of preparing the slab, pulled out all carpet and im putting in blackbutt 12mm overlay.
I will be sealing the concrete.
My dilema is what s the difference between the three brands of sealer and glue. ie Selleys, Sika, and Bostik?
Why do you recommend one over the other? Do the boards have to be chocked tight once their glued down and do you put wieghts to hold them down while the glue dries?
Is it a better method to seal concrete, lay down 15mm plywood and glue the floorboards to the ply?
Another thing is im also replacing the tiles in lounge and living areas, it seams to be some sort of motar or screed that was laid over the concrete and tiles where glued on that.
Would it be best to remove it or remove tiles and glue then seal it and glue floorboards?
Some advice would be really helpful
CHeers MArz
Read the full thread at RenovateForum.com...
Similar Threads
-
where to buy plastic tongue for overlay flooring?
By rmit-teacher in forum FLOORINGReplies: 3Last Post: 22nd November 2007, 08:07 PM -
advice needed on a suitable flooring for kitchen
By Ayesha in forum FLOORINGReplies: 2Last Post: 6th April 2007, 01:03 AM -
Levelling a chipboard floor ready for glueing overlay flooring
By Stephen H in forum FLOORINGReplies: 11Last Post: 4th February 2007, 01:55 PM
Bookmarks