Good reading

Question is about Elect from house to shed
I dug the trench and laid orange PVC pipe
Sparkie installed the cable and switchboard etc etc
Now I need to backfill the trench

1. Do I need to:
lay a plastic marker strip over the full length of cable in the trench
200mm above the orange PVC pipe.
or is that only for unencased cable?

2. Do I need to:
Put up marker signs where any cable enters or leaves a building.
or is that only for unencased cable?

3 Do I need to:
provide mechanical protection for the cable from the trench depth
to where it enters the edge of the concrete slab
or is that only for unencased cable?

Thanks in anticipation


More...