Hi,

Can anyone give me an estimate of drying/setting time of plaster before tiling over?

The plaster is only between plasterboard sheets and over the screw holes. If it looks dry after a couple of hours....is this long enough or should there be a minimum time before tiling?

The plaster is for Wet areas. Thanks all.


More...