Results 1 to 9 of 9

Thread: Level Sand

  1. #1
    Join Date
    Aug 2007
    Location
    sydney
    Posts
    29

    Default Level Sand

    Hopefully someone with paving experience can help with this question, I'm about to put in an a small above ground pool the area is 4 x 4 m and I need to level the ground with sand.

    How is this done i have never even paved before and I'm not sure of the technique for levelling sand...

  2. #2
    Join Date
    Aug 2005
    Location
    Victoria
    Posts
    412

    Default

    Set up a screed rail at the required height on both sides of the area,and run a straight edge along it,pulling the sand with the screed as you go.

    Tools

  3. #3
    Join Date
    Jan 2007
    Location
    Adelaide - West
    Age
    43
    Posts
    311

    Default

    as above, but for a pool id hire a plate compactor for the job aswell. Put the sand in 50-100mm high then wack it, then screed off.

    Also when you get your sand it'd be good to get a corse type of sand- eg what they call here in S.A. PM64 grade- tell the guy at the dirt place what you need it for and he should have a fair idea of price vs suitability.
    If you dont play it, it's not an instrument!

  4. #4
    Join Date
    May 2007
    Location
    Bundoora, Melbourne
    Posts
    197

    Default

    Use steel screed rails and a steel straightedge- it'll be a lot easier.

    Make sure when you get the rails to height to pack sand tightly around it so it doesnt move while screeding the sand back. Then when done take the rails out and fill with sand and float off
    Planned Landscape Constructions
    www.plannedlandscape.com.au

  5. #5
    Join Date
    Jun 2007
    Location
    sydney
    Posts
    121

    Default

    Am I right in saying that if you just flooded the sand with water it would settle in a level position and also be compacted.

  6. #6
    Join Date
    Aug 2006
    Location
    Sydney
    Age
    65
    Posts
    1,248

    Default

    no

  7. #7
    Join Date
    Aug 2007
    Location
    sydney
    Posts
    29

    Default Road Base

    ok thanks i now have a better idea on how this is done, should i bother doing a layer of roadbase first...

  8. #8
    Join Date
    Nov 2006
    Location
    Bendigo Victoria
    Age
    80
    Posts
    4,565

    Default

    yes

  9. #9
    Join Date
    May 2007
    Location
    Bundoora, Melbourne
    Posts
    197

    Default

    The better the roadbase= how secure the paving level will be and how long it lasts

    Give it 75-100mm to be sure, seeing as it is next to a pool. Just make sure the subsoil is firm, if it is fill you will need a greater depth of roadbase. There will be more work in excavation, but the longevity will be worth it

    Compact it in 50mm layers too and slightly wet it, it compacts much harder that way.
    Planned Landscape Constructions
    www.plannedlandscape.com.au

Similar Threads

  1. Piling for slab on sand
    By EEL in forum CONCRETING
    Replies: 6
    Last Post: 7th November 2007, 01:07 PM
  2. Replies: 3
    Last Post: 4th January 2007, 04:17 PM
  3. "Strait-line" laser level
    By Eddie Jones in forum GENERAL ODDS N SODS
    Replies: 5
    Last Post: 29th March 2006, 08:58 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •