    Hi we're currently in the process of renovating the bathroom.

    we're putting in a shower instead of the bath/shower combination that was already there.

    my problem is the position of the waste for the new shower base is going to come only about 20 mm to one side of a floor joist.

    is there any way to overcome this.

    i have a 50 mm space between the bottom of the waste outlet on the shower base and i have to pour a 50 mm concrete slab to bring the floor to same level as the rest of the floor (the shower is going in where we removed a cupboard from) so i'd have about a 100 mm.

    is there anything that can be done or am i screwed?

    any help appreciated thanks

  2. #2
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    722

    Default

    Can you partially or fully cut the joist to allow the wast to fit, then add an additional joist on either side of the one you cut?

  3. #3
    Join Date
    Dec 2004
    Location
    Northen Rivers NSW
    Age
    58
    Posts
    758

    Default

    I would brace along its length and then cut as much of the joist out that is in the way, all if it has to go. Then rebrace / box around it.



  4. #4
    Join Date
    May 2001
    Location
    Queanbeyan
    Age
    60
    Posts
    732

    Default

    Any photos?

    But cutting and moving the joist would seem the simplest option.

    Cheers
    There was a young boy called Wyatt
    Who was awfully quiet
    And then one day
    He faded away
    Because he overused White


    Floorsanding in Canberra and Albury.....

  5. #5
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    59
    Posts
    5,026

    Default

    Had to do this once. You can put in another joist beside the one that's in the way, but it really needs to span at least bearer to bearer so that the bearers are taking the weight of the new joist. Technically, it should span at least two bearers on either side, so that it is continuous and not single span. If the distance between the new joist and the next joist opposite the one to be cut is greater than your maximum joist spacing, you'll need one either side of it.

    I've seen some dodgy work done in this department, including hacking out a chunk of the joist with no reinforcement. I wouldn't recommend that. I've also seen people bolt short bits of timber to the side of the joist and then cut out a section. Personally, I'd not like to do that if it was my house.

  6. #6
    Join Date
    Jul 2004
    Location
    ipswich Queensland (Gods backyard)
    Age
    69
    Posts
    286

    Default

    this should help you
    http://plumbdinger.com.au/
    kind regards
    tom armstrong
    www.kitcheninabox.com.au
    Flat Packed kitchens to the world

  7. #7
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    59
    Posts
    5,026

    Default

    I thought about one of them but wasn't sure if they're suitable for use under a shower tray. On second thoughts, I don't see why not but would be worth checking with them first.

  8. #8
    Join Date
    Jul 2004
    Location
    ipswich Queensland (Gods backyard)
    Age
    69
    Posts
    286

    Default

    Quote Originally Posted by silentC View Post
    I thought about one of them but wasn't sure if they're suitable for use under a shower tray. On second thoughts, I don't see why not but would be worth checking with them first.

    and thats the only reason that i submit resolutions to this forum
    kind regards
    tom armstrong
    www.kitcheninabox.com.au
    Flat Packed kitchens to the world

  9. #9
    Join Date
    Mar 2004
    Location
    Carine WA
    Age
    75
    Posts
    110

    Default

    Quote Originally Posted by reybec View Post
    my problem is the position of the waste for the new shower base is going to come only about 20 mm to one side of a floor joist.

    is there any way to overcome this.
    IF you need to remove part (all) the thickness of the joist for access to the waste, you can use 100x50x10mm angle bolted through the remainder of the joist. Doing this will allow you to remove a sizeable chuck of joist without losing floor strength. It would be best to have the 50mm side under the joist but if that also gets in the way of the waste then having the angle the other way will still be strong. Make the length of the angle iron as long as possible, but at least 1m either side of the cut in the joist. If the cut in the joist is near a bearer then use the bearer for support.

    How much of the current joist would you have to remove to allow waste installation?
    Kind Regards

    Peter

  10. #10
    Join Date
    Jan 2005
    Location
    brisbane
    Age
    58
    Posts
    50

    Default

    thanks for your help everyone
    i thought cutting the joist was going to be the best option

    Quote Originally Posted by MrFixIt View Post
    How much of the current joist would you have to remove to allow waste installation?
    pretty much most of it

    Quote Originally Posted by silentC View Post
    Had to do this once. You can put in another joist beside the one that's in the way, but it really needs to span at least bearer to bearer so that the bearers are taking the weight of the new joist. Technically, it should span at least two bearers on either side, so that it is continuous and not single span.
    i can span a new joist from one bearer to another (2 metre span)
    if i try to span 2 i will run into the same problem with another waste pipe which is in the way and can't access the bearers the other way without demolition work

    would spanning 2 metres between 2 bearers be sufficient and would the new joist necessarily have to be hardwood like the rest of them?

    Quote Originally Posted by arms View Post
    this should help you
    http://plumbdinger.com.au/
    i'm liking the idea of this one

    can it be used under a timber floor?

  11. #11
    Join Date
    Jul 2004
    Location
    ipswich Queensland (Gods backyard)
    Age
    69
    Posts
    286

    Default

    i'm liking the idea of this one

    can it be used under a timber floor?[/quote]

    i use them when ever i have problems with bathroom renovations ,they are great and lets face it they are only adjustable position pvc fittings and will last as long as ridged piping will
    kind regards
    tom armstrong
    www.kitcheninabox.com.au
    Flat Packed kitchens to the world

  12. #12
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    722

    Default

    I'd use hardwood ... especially under a wet area.

    In terms of the span ... just cut the existing joist and add a new one on each side. Then you have doubled up, which will resolve your single span issue.

  13. #13
    Join Date
    Jan 2005
    Location
    brisbane
    Age
    58
    Posts
    50

    Default

    had another look and was able to solve the problem using two 45 degree elbows and a piece of pipe

    i only had to move the actual hole about 20 mm

Similar Threads

  1. Urgent concrete advice wanted
    By Rossluck in forum CONCRETING
    Replies: 7
    Last Post: 28th November 2006, 02:02 PM
  2. Reno advice wanted
    By tjbaxter in forum PAINTING, PLASTERING, TILING, DECORATING, etc.
    Replies: 8
    Last Post: 16th January 2006, 07:48 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •