    Hi,
    I'm just about to reboard a 13m x 2m deck and, as the deck is at first floor level, I'm concerned about safety when working . I've had a bit of a look around but so far have been unable to find any suitable harness or any other apparatus which would safely break any fall.
    Any suggestions re suitable apparatus and availabilty?
    Is it possible to rent this equipment ? I will only need it for a couple of weeks.
    Regards/Pk

  2. #2
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    59
    Posts
    5,026

    Default

    Your local hire place should be able to provide safety gear. Are you worried about going over the edge or between the joists? Maybe all you need is a temporary guard rail around the perimeter.

  3. #3
    Join Date
    Jul 2006
    Location
    Canberra
    Age
    55
    Posts
    265

    Default

    Pk if it has not already got a rail around the outer edge the structure is not legal and if you are worried about falling through all you need to do is get a couple of sheets of 9mm ply rip them in half and lay them temporarily on the joists and work fro them till you have enough decking laid to work from.

    Just a tip. If you need to butt join two boards make sure they end on a joist and try and mix up where the joints are to give an even look to the deck. Skew nail and ALWAYS pre-drill the ends of the boards to prevent splitting. Disregard this if you know already.

    Take care and have fun.

    Pete
    If you are never in over your head how do you know how tall you are?

  4. #4
    Join Date
    Dec 2001
    Location
    Between a rock & a hard place (vic)
    Posts
    367

    Thumbs up

    The main questions are covered above - is it over the edge of straight down between the joists?

    Many people select a harness not knowing there's at least a dozen different ways of setting up a harness system - the main question is fall prevention or fall arrest?

    If it's fall arrest, you need the anchor point (must be tied off above your shoulders and the lanyard setup taking into account any expanding shock absorber). Another question if using a fall arrest setup - how are you going to get down and out of the harness if you do fall?

    If you inetend to tie a rope off for fall arrest, it's a good idea that the structural member be able to withstanding 15kN. If you intend on using it for travel restraint it's only 6kN.

    All up, using temporary decking boards, guardrail edge protection and working your way backwards from the leading edge is far safer and typically far simpler that setting up a safe harness system. If you do use temporary ply or planks, don't have more than 200mm of the ends unsuported and temorarily screw them down to prevent movement.

  5. #5
    Join Date
    Feb 2006
    Location
    Perth
    Posts
    1,174

    Default

    Quote Originally Posted by Eastie View Post
    If it's fall arrest, you need the anchor point . . .
    DO NOT repeat DO NOT use the tow ball / trailer hitch on a car for this purpose !

    If you are re-boarding, is it possible to remove only small sections of the old boards as you place the new ones down?

  6. #6
    Join Date
    Aug 2003
    Location
    Pambula
    Age
    59
    Posts
    5,026

    Default

    It's a bit tricky with the temporary decking idea because the best way to lay a deck is to lay every fourth or fifth board to a string/chalk line and then infill using wedges to adjust the gap. If you do it that way though (and trust me, you'll be glad you did) you can walk on the decking you have already laid. Once you've laid every fourth or fifth board, you will have a gap between them of between 300-400mm. You're unlikely to fall through it but it will hurt if you try

  7. #7
    Join Date
    Sep 2005
    Location
    Currumbin, Queensland
    Posts
    6

    Default Thanks

    Thanks everyone for your detailed suggestions.

    I don't foresee any specific problems, it's just that I have a healthy respect for Mr Murphy and his law.

    The outer edge railing is in place. I'm just replacing the boards.

    I like the idea of laying temporary ply sheets and also laying every fourth or fifth board to a string/chalk line and then infill using wedges to adjust the gap.

    Regards/PK

Similar Threads

  1. Health and Safety Forum
    By adrian in forum FORUMS INFO, HELP, DISCUSSION & FEEDBACK
    Replies: 26
    Last Post: 7th August 2004, 01:16 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •