    Default Moving Concrete Blocks

    G'day all,

    Building a retaining wall out of 1200x600x600 concrete blocks which weigh about 1 tonne each. Just wondering what you guys think would be the best way to get them from the front of the house to the back. Side access is restricted and wouldn't be able to get a dingo (not that a dingo could lift one) or similar size machine through.

    I was thinking of using a 2 tonne hand winch and dragging them along the ground, possibly on some kind of sled. Painful, I know, but I'm struggling to think of an alternative.

    Cheers

  2. #2
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    63
    Posts
    2,026

    Default

    Flyboy,
    if you're going to winch them along the ground it would be a lot easier if you used some 200mm dia koppers logs as rollers. If you can't get a machine in and can't get access through a friendly neighbour's yard the only other alternative is a big crane over the top.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  3. #3
    Join Date
    May 2004
    Location
    Pakenham, outer Melb SE suburb, Vic
    Age
    55
    Posts
    549

    Default

    Ring the Egyptian embassy...


    The beatings will continue until morale improves.

  4. #4
    Join Date
    Jul 2004
    Location
    Sale
    Age
    69
    Posts
    559

    Default

    Like Mick said rollers are fairly easy. You could also lay some timber like a railway line, 4" x 2" hardwood nothing fancy and use small diameter rollers of around 50mm either pipe or timber. The smaller rollers are less likely to take off and the timber "rails" stop the rollers sinking. Try the bigger ones first, and don't stand in front of the moving block.

    John

  5. #5
    Join Date
    Oct 2003
    Location
    Sydney,Australia
    Posts
    42

    Default

    There are a couple of ways to move the blocks - just watch out for the grade.

    The first method is documentable to the Classical Greek temple builders - make a pair of solid wheels with a block sized cutout in the middle. Jack up the block (levers & blocks) then slide a wheel onto each end - you will need some connecting rods to bolt the wheels at a fixed distance apart. Then just roll the contrapition into place & reverse the wheel process - you can use levers or ropes to push or pull the thing into place.

    Another interesting method I have seen on video is to make a track of arc shaped sections, the length of each curved section being equal to the length of a side of the cube, and about the width of the block. There is a trick here that I don't have a ready formula for - the height of the arc. You will have to calculate how high to make it so that the centre of the block travels in as straight a line as possible. Again levers or a rope wrapped round the block should allow you to push/pull the block.

    The second method should be quicker as there is less per-block setup & knock down, but there is more calculation involved. Who said a classical education is wasted

  6. #6
    Join Date
    Nov 2004
    Location
    Melbourne
    Posts
    173

    Default

    Do you have any access to the back at all if so all you need is 760mm and the link at the bottom should help, do google search for mini crawler cranes, awesome bits of engineering, they even go through doorways, dont know if the missus would want 1.5 ton machine in the lounge room though. I dont know if they can carry and move at the same time though, give them a call and they may be able to help, they are in sydney and they hire as well.

    http://www.pacecranes.com.au/maeda_c...ire_mc274.html

  7. #7
    Join Date
    Feb 2005
    Location
    Sydney
    Posts
    65

    Default

    Thanks for the replies everyone. Quite a few good ideas to keep me going
    Cheers

  8. #8
    Join Date
    May 2006
    Location
    Sydney
    Posts
    7

    Default

    I had to move some very heavy I-Beams via a similar access and trust me rolling them on some koppers logs is not as silly or archaic as it seems. I actually had to push mine up a slight grade and it was not that hard at all. I'd recommend putting a slab on, get a few mates over and try the log method first before shelling out for a crane who will charge like a wounded bull. It's easier with a few blokes as someone can pick up and place the logs in front as you roll over them. You can even turn corners with clever log placement and a bit of effort. Hell, who wouldn't push a few blocks round for a slab.

  9. #9
    Join Date
    Apr 2006
    Location
    NSW
    Posts
    63

    Default

    This link should give you some encouragement.

    http://www.parascope.com/en/articles/coralCastle.htm



    HJ0

Similar Threads

  1. Replies: 1
    Last Post: 30th January 2006, 09:14 PM
  2. How to concrete posts/brackets into place?
    By ptyltd in forum CONCRETING
    Replies: 5
    Last Post: 20th January 2006, 01:07 PM
  3. Concrete Footings...Is there a better way?
    By Flyboy in forum CONCRETING
    Replies: 38
    Last Post: 4th September 2005, 06:19 PM
  4. Cutting Concrete Blocks in Half
    By jlamplough in forum CONCRETING
    Replies: 10
    Last Post: 22nd March 2005, 02:43 PM
  5. Concrete over concrete
    By Sir Stinkalot in forum CONCRETING
    Replies: 4
    Last Post: 18th July 2003, 10:59 PM