I'm thinking of getting an instantaneous HWS and wondering whether or not I should also replace the main 1/2 inch hot water cu pipe from the existing water heater with say 3/4 inch lagged cu pipe. The system will be located at the rear and adjacent to the kitchen and I need to supply the bathroom nearer to the front of the house. What are the pros and cons to increasing the main feed to the bathroom to 3/4 inch lagged pipe? What are the regulations?