Search:

Tag: dar

Page 1 of 2 1 2

Search: Search took 0.00 seconds.

  1. Hammer C3 31 -Must tell Someone!

    Started by Big Bubba, 4th June 2009 07:06 PM
    3 Pages
    1 2 3
    $5700, 2400mm, bifold, build, buy, converting, cost, cubic, dar, designed, door, doors, external, feeling, french, hammer, hurdle, laundry, metre, panel, purchased, quantities, rosewood, sets, size, started, timber, window, windows, wood
    • Replies: 33
    • Views: 10,313
    Last Post: 2nd September 2016 08:20 PM
    by Brett27  Go to last post
  2. tas oak / vic ash 65x19 DAR 125 L/m

    Started by Sam, 9th July 2015 11:06 AM
    100, 125, 65x19, ash, dar, l or m, oak, tas, vic
    • Replies: 2
    • Views: 1,070
    Last Post: 9th July 2015 12:57 PM
    by Sam  Go to last post
  3. Alternatives to expensive DAR timber

    Started by Steve191, 25th June 2015 04:43 PM
    2 Pages
    1 2
    alternatives, dar, expensive, timber
    • Replies: 16
    • Views: 3,743
    Last Post: 28th June 2015 10:42 AM
    by safari  Go to last post
  4. quick question when ordering pine framing

    Started by breakerboy2000, 20th July 2014 11:14 AM
    90x45, bunnings, corners, dar, finishes, framing, grooves, names, ordering, pine, plan, question, quick, rounded, shed, slighty, smooth, type, types, wood
    • Replies: 2
    • Views: 1,713
    Last Post: 20th July 2014 02:51 PM
    by Wrongwayfirst  Go to last post

    Forum:
    TIMBER

  5. QLD Dressed Australian Red Cedar

    Started by IAN FEENEY, 22nd June 2014 06:31 PM
    $3000, /520mm, 0422981908, 1.3+, 1200, 25mm, 350, 50mm, australian, cedar, colour, cost, couple, cubic, dar, deliver, happy, ian, inspections, metres, minimum, phone, pictures, pieces, red, stored, toowoomba, undressed, widths, yrs
    • Replies: 0
    • Views: 1,565
    Last Post: 22nd June 2014 06:31 PM
    by IAN FEENEY  Go to last post
  6. QLD Satin Sycomore

    Started by John.G, 4th April 2014 02:38 PM
    • Replies: 1
    • Views: 1,692
    Last Post: 4th April 2014 09:00 PM
    by Xanthorrhoeas  Go to last post
  7. Grinding and wire-brushing

    Started by NathanaelBC, 14th February 2014 09:07 AM
    bits, dar, difference, distress, fairly, finish, finished, grab, grinding, jutty, makes, outy, perfectly, piece, remotely, rip, rough, rough sawn, rustic, sample, sawn, smooth, suggestions, surface, timber, undesirable, unevenly, wire brush, wirebrushing, wood
    • Replies: 7
    • Views: 3,974
    Last Post: 14th February 2014 07:56 PM
    by NathanaelBC  Go to last post
  8. VIC 7. 19 lengths of Red Gum, DAR

    Started by TermiMonster, 4th October 2013 03:00 PM
    • Replies: 3
    • Views: 1,657
    Last Post: 8th October 2013 11:18 AM
    by TermiMonster  Go to last post
  9. VIC Mixed Aussie Hardwood, Dressed, mostly select, shorts

    Started by TermiMonster, 4th October 2013 12:26 PM
    • Replies: 2
    • Views: 758
    Last Post: 5th October 2013 05:44 PM
    by TermiMonster  Go to last post
  10. VIC 5. Mixed Aussie Hardwood DAR

    Started by TermiMonster, 4th October 2013 02:32 PM
    • Replies: 2
    • Views: 1,090
    Last Post: 5th October 2013 05:42 PM
    by TermiMonster  Go to last post
  11. NSW Radiata Pine Salt & Pepper Mill Blanks

    Started by h_samtani, 8th September 2013 11:32 PM
    • Replies: 0
    • Views: 1,327
    Last Post: 8th September 2013 11:32 PM
    by h_samtani  Go to last post
  12. Glass Top Coffee Table - WIP

    Started by GarciaJ, 28th December 2012 02:39 PM
    2 Pages
    1 2
    • Replies: 25
    • Views: 4,600
    Last Post: 12th August 2013 04:50 PM
    by lathakumar  Go to last post
  13. Using pine DAR for skirts and arcs

    Started by Reno RSS Feed, 16th May 2013 12:40 AM
    arcs, be.any, believing, comments, dar, decide, dedicated, edge, fooling, hahaha, harder, heard, hoping, installation, pine, profile, pull, read, rebate, renovateforum.com, reply, simple, skirting, skirts, square, super, thread
    • Replies: 0
    • Views: 1,332
    Last Post: 16th May 2013 12:40 AM
    by Reno RSS Feed  Go to last post
    • Replies: 4
    • Views: 2,560
    Last Post: 3rd April 2013 10:10 AM
    by Greg Ward  Go to last post

    Forum:
    TIMBER

  14. Huge office table

    Started by neddy, 16th February 2013 01:49 PM
    120x45, 3100, 900, aim, bark, biscuit, boards, clamp, dar, gentlemen, glue, huge, iron, join, method, office, plently, purchased, pva, recently, recycled, table
    • Replies: 5
    • Views: 1,172
    Last Post: 17th February 2013 10:33 PM
    by elanjacobs  Go to last post
  15. 25mm thick DAR Pine

    Started by Mr Big, 19th June 2012 09:53 PM
    2 Pages
    1 2
    25mm, 38mm, aim, cheap, cheapest, chest, dar, finished, funds, happy, hardwood, main, move, mysterious, option, pine, planer, question, ringing, rough, sawn, stock, suggest, suggestions, sydney, thick, thickness, thicknesser, timber, tool
    • Replies: 16
    • Views: 8,436
    Last Post: 30th June 2012 02:36 PM
    by Mr Big  Go to last post

    Forum:
    TIMBER

  16. Shed cupboard

    Started by Onezero, 28th May 2012 11:10 AM
    16mm, 2400x2400x600, 42x19, added, breeze, built, caulk, cupboard, dar, date, design, doors, easy, fall, file, hand, kids, largest, light, mdf, pine, prints, sharing, shed, shelves, sketchup, supports, time, tubes, upload
    • Replies: 1
    • Views: 1,832
    Last Post: 29th May 2012 08:09 PM
    by wun4us  Go to last post

    Forum:
    THE SHED

  17. Red Gum and Huon Pine Hall Table Build

    Started by LGS, 12th May 2012 10:01 PM
    2 Pages
    1 2
    400g, 65mm, angle, base, board, build, dar, dimensioned, drawer, figure, finished, front, gum, hall, huon, left, legs, length, marked, oiling, pic, pine, rail, ready, red, squares, table, template, timber, wood
    • Replies: 19
    • Views: 4,408
    Last Post: 22nd May 2012 11:31 PM
    by olas  Go to last post
  18. NG Rosewood

    Started by Shane Watson, 18th June 2011 09:23 PM
    150, 2tsup, bought, brisbane, build, cheers, dar, doors, dress, firing, match, option, priced, rosewood, rough, sawn, size, timber, timberwork, tools
    • Replies: 5
    • Views: 2,343
    Last Post: 24th July 2011 12:50 AM
    by wabbit  Go to last post

    Forum:
    TIMBER

  19. Tassie Oak

    Started by Egbert, 25th May 2011 02:39 PM
    190mm, 19mm, boards, brisbane, bunnings, buy, dar, oak, shelves, stocking, stopped, tassie
    • Replies: 2
    • Views: 1,471
    Last Post: 29th May 2011 10:12 AM
    by scuttle  Go to last post

    Forum:
    TIMBER

  20. fence posts - cypress, spotted gum or merbau

    Started by andyc2005, 24th April 2011 01:55 AM
    125mm, 750mm, 90mm, bark, centre, cost, cypress, dar, deckign, feel, fence, gate, gold, ground, gum, iron, means, merbau, passenger, posts, screwed, screws, size, slat, sliding, solid, spotted, super, understand, vertical
    • Replies: 4
    • Views: 9,603
    Last Post: 26th April 2011 12:36 AM
    by andyc2005  Go to last post

    Forum:
    TIMBER

  21. Newbie question about rough sawn Blackwood

    Started by copycath, 7th March 2011 12:46 PM
    19mm, 25mm, blackwood, bought, dar, difficult, dress, dressed, dumb, experience, hope, intention, jointer, local, locally, mens, mess, newbie, oak, pine, planer, question, readily, rough, sawn, shed, stock, thick, wood, yield
    • Replies: 7
    • Views: 1,692
    Last Post: 9th March 2011 06:10 PM
    by billbeee  Go to last post

    Forum:
    TIMBER

  22. Metal Basher from Torquay sees the light.

    Started by OtwayRider, 18th February 2011 11:10 AM
    $120, 200, advice, basher, beautiful, benchtop, benefit, billiard, building, cost, cypress, dar, experience, gorgeous, gum, ironbark, light, metal, options, pete, qld, red, run, sees, smoother, table, thicknesser, torquay, twist, warp
    • Replies: 4
    • Views: 1,451
    Last Post: 19th February 2011 05:04 AM
    by issatree  Go to last post
  23. Where to buy some Paulownia

    Started by Arron, 8th February 2011 08:56 PM
    12mm, 600x400x300, arron, boxes, buy, cabinet, carefully, cheers, contingency, dar, drawers, flattish, flip, gday, inspired, japan, keeping, kiri, lid, matter, measure, paulownia, prefer, project, run, thick, thinking, top, white, wood
    • Replies: 5
    • Views: 4,709
    Last Post: 11th February 2011 10:15 AM
    by Arron  Go to last post

    Forum:
    TIMBER

  24. stuffed deck

    Started by jake.ok, 26th January 2011 10:27 AM
    $30, 190, 190x42, 40-45, advice, apreciated, bridge, budget, built, checking, cheers, client-, cliet, dar, deck, dried, house, karri, prob, replace, round, set, severe, stuffed, surface, thick, timber, time, weeks, wide
    • Replies: 6
    • Views: 1,636
    Last Post: 31st January 2011 08:33 PM
    by jake.ok  Go to last post

    Forum:
    TIMBER

  25. Paint finish for childs bed ?

    Started by g_coopster, 20th December 2010 10:58 AM
    appreciated, base, basic, bed, child, childs, confused, cot, dar, existing, finish, frame, gloss, mattress, paint, pine, plan, question, relating, semi, simple, tackle, white
    • Replies: 2
    • Views: 2,562
    Last Post: 30th December 2010 05:02 AM
    by hcim  Go to last post

    Forum:
    FINISHING

  26. Veritas Square fence

    Started by fubar, 30th November 2010 02:14 PM
    25mm, 6mm, accurate, aligns, arm, benefit, blade, bought, butt, carbatec, dar, decking, edge, experience, eye, fence, found, framing, ideal, ledge, material, providing, quicker, relying, rests, square, supporting, veritas, weight, workpiece
    • Replies: 0
    • Views: 2,616
    Last Post: 30th November 2010 02:14 PM
    by fubar  Go to last post
  27. rough sawn 'tassie oak' available in geelong area

    Started by pellcorp, 17th July 2010 11:28 PM
    afford, area, bed, bunnings, buy, buying, dar, delux, exotic, fit, geelong, hobbiest, jason, jet, jointer, lengths, oak, preferable, preferably, priced, rough, saturdays, sawn, sell, station, suggest, tassie, thicknesser, treat, wagon
    • Replies: 1
    • Views: 2,650
    Last Post: 18th July 2010 09:13 AM
    by Gwhat  Go to last post

    Forum:
    TIMBER

  28. Vic Ash supplies SE Qld wanted.

    Started by Brko, 15th July 2010 12:10 PM
    100, 135x19, advice, answers, appreciated, ash, boris, dar, greatly, job, lineal, process, qld, sourcing, suppliers, supplies, vic, wanted
    • Replies: 1
    • Views: 1,254
    Last Post: 16th July 2010 12:47 AM
    by pjt  Go to last post

    Forum:
    TIMBER

  29. Baseboard sizes and regulations

    Started by redcordial, 29th March 2010 08:27 PM
    70x19, 70x25, baseboard, baseboards, cheers, dar, job, pine, pretty, ratty, regulations, replace, restumped, sizes, thickness, treated
    • Replies: 3
    • Views: 1,274
    Last Post: 10th April 2010 08:04 AM
    by redcordial  Go to last post

    Forum:
    TIMBER

  30. What saw choice for this job?

    Started by g_coopster, 22nd March 2010 12:17 PM
    accurate, basic, box, cheers, choice, coping, cost, crosscut, crosscuts, cuts, dar, dearly, deg, essentially, forum, initial, job, mitre, mouldings, neat, porta, purchase, reading, reasonable, reference, reliable, situation, topics, varied
    • Replies: 7
    • Views: 2,801
    Last Post: 31st March 2010 07:18 AM
    by g_coopster  Go to last post
  31. Value of a few timber species.

    Started by pngtimber, 21st February 2010 01:53 AM
    1.5-3, 100, 100x50, 150x50, 1st, appreciated, atleast, cedar, dar, decent, ebony, forums, grade, king, knowledge, lengths, meters, pay, pieces, pricing, queen, reading, rosewood, rs/kd/dar, select, siegmund, species, timber, tiny, white
    • Replies: 1
    • Views: 1,698
    Last Post: 21st February 2010 10:18 PM
    by Eldanos of KDM  Go to last post

    Forum:
    TIMBER

  32. Best value combo thicknesser jointer

    Started by Psych 101, 24th April 2009 08:01 PM
    5 Pages
    1 2 3 4 5
    2hp, addictive, advice, bunnings, call, carbatec, combo, dar, dusty, jet, jointer, love, machine, mdf, money, move, obsessed, passionately, pine, ply, proshop, purchase, purchased, recently, table, thicknesser, tolerance, triton, upgrading, workcentre
    • Replies: 66
    • Views: 21,742
    Last Post: 16th November 2009 11:06 PM
    by pjt  Go to last post
  33. Decking Post Size?

    Started by Reno RSS Feed, 25th October 2009 12:10 AM
    100, dar, deck, decking, dried, f27, ground, hardwood, kiln, level, merbau, minimum, oregon, post, posts, read, reading, renovateforum.com, replacing, rotten, size, sizing, stands, suggests, thread, x100
    • Replies: 0
    • Views: 1,655
    Last Post: 25th October 2009 12:10 AM
    by Reno RSS Feed  Go to last post
  34. Wanted Hardwood Timber Supplier

    Started by Off the Block, 4th August 2009 05:37 PM
    0010, 2.5m, 9958, appreciated, artist, assist, aust, building, dar, details, fireplace, forward, friend, hardwood, heritage, mantle, peter, phone, piece, purchase, recycled, reply, section, suggest, supplier, sydney, timber, timer, to100mm, wanted
    • Replies: 2
    • Views: 1,314
    Last Post: 4th August 2009 09:18 PM
    by chowcini  Go to last post

    Forum:
    TIMBER

  35. Timber Supplies in NZ

    Started by HandyAndrea, 19th November 2008 07:19 PM
    american, aussie, bay, boards, cedar, couple, crap, dar, despaired, expensive, folks, hawkes, here.u, hideously, hope, island, itm, north, oak, radiata, recently, rimu, round, settle, species, supplies, timber, timbers, time, variety
    • Replies: 3
    • Views: 1,493
    Last Post: 20th November 2008 06:40 PM
    by Ianab  Go to last post

    Forum:
    TIMBER

  36. Buying small qty radiata pine in Sydney.

    Started by Old farmer, 16th November 2008 08:05 PM
    100, 1000, 25mms, 5-door, 900, browned, buying, car, collect, dar, days, frequently, grandsons, grumpy, lengths, luck, morning, nominal, pine, qty, quantity, radiata, saturday, short, small, strathfield, sydney, timber, yard
    • Replies: 5
    • Views: 2,743
    Last Post: 19th November 2008 02:44 PM
    by Old farmer  Go to last post

    Forum:
    TIMBER

  37. DAR - Hand Plane RACE!

    Started by Lumber Bunker, 7th October 2008 07:00 PM
    30secs, add, belt, board, camphor, cash, check, cool, dar, edge, finish, friday, hand, jason, light, minutes, month, nominate, plane, post, race, rough, rules, square, sticks, straight, thickness, time, untill, winding
    • Replies: 13
    • Views: 2,103
    Last Post: 13th October 2008 12:37 PM
    by Lumber Bunker  Go to last post
  38. Aarrrrrrrrrr

    Started by soundman, 19th September 2008 03:26 PM
    aarrrrrrrrrr, arrrrr, art, aye, bilge, bilgerats, buckets, check, chum, close, dar, day, ere, heed, knowin, listen, load, lubbers, pay, pirate, shipmates, slip, talk, tink, water, www.talklikeapirate.com
    • Replies: 10
    • Views: 1,760
    Last Post: 22nd September 2008 08:11 AM
    by Stevenp  Go to last post
  39. High strength glue

    Started by catstrat, 11th July 2008 06:39 PM
    $30, 25mm, 308, application, attached, beading, bit, cat, dar, glue, guys, high, hope, makes, maple, pine, ply, prefer, radiata, recommend, screwed, selleys, sense, speaker, spend, strength, stress, strong, suitable, wood
    • Replies: 7
    • Views: 1,975
    Last Post: 11th July 2008 08:23 PM
    by watson  Go to last post

    Forum:
    GLUE

  40. free pine DAR in Rocklea,Queensland

    Started by pineforyou, 26th May 2008 09:38 PM
    140, 290, 4000, 6-10, basis, brisbaneone, cuts, dar, free, furniture, guys, happy, heaps, home, individuals, manufactor, mark, normaly, ongoing, pine, queensland, remaining, rocklea, send, throw, timber, tip
    • Replies: 9
    • Views: 2,768
    Last Post: 7th July 2008 10:17 PM
    by rhancock  Go to last post

    Forum:
    TIMBER

  41. Gosford - Store Person / Sales - PT

    Started by Lumber Bunker, 5th June 2008 09:32 PM
    43236922, apply, arrangement, bunker, cleaning, cutting, dar, displays, fax, gosford, info@lumberbunker.com.au, involves, job, lumber, machining, person, position, pricing, resume, sales, selecting, send, size, steve, stock, store, tasks, thomas, timber, workshop
    • Replies: 1
    • Views: 1,524
    Last Post: 18th June 2008 11:31 PM
    by Lumber Bunker  Go to last post

    Forum:
    EMPLOYMENT

  42. Pine Pack Rate

    Started by timber_quality, 19th May 2008 05:28 PM
    $1.48, $3.76, $4.70, $6.64, 133x12, 190x19, 240x19, 290x19, board, cheaper, dar, gst, hear, including, l/m, lining, lower, lowest, newcastle, pack, packs, pine, price, prices, radiata, rate, sizes, splitting, standard, wondering
    • Replies: 3
    • Views: 1,834
    Last Post: 31st May 2008 11:57 PM
    by timber_quality  Go to last post

    Forum:
    TIMBER

  43. Transport Costs

    Started by timber_quality, 27th May 2008 05:39 PM
    appreciated, cheers, costs, dar, giving, greatly, idea, newcastle, packs, pine, transport, victoria, wondering
    • Replies: 3
    • Views: 1,594
    Last Post: 28th May 2008 04:27 PM
    by timber_quality  Go to last post

    Forum:
    TIMBER

  44. Cheap Pine

    Started by timber_quality, 8th May 2008 12:17 AM
    290x19, bit, bits, buy, cheap, cheapest, dar, fair, havnt, ideas, lots, lower, newcastle, pack, pieces, pine, prices, radiata, relos, splitting, standard, storage, wondering
    • Replies: 1
    • Views: 1,468
    Last Post: 8th May 2008 12:36 AM
    by BobL  Go to last post

    Forum:
    TIMBER

  45. Pine and MDF stand

    Started by Rodt68, 4th May 2008 09:06 PM
    appreciated, attack, bad, bits, cyprus, dar, doors, dreaming, finish, finish/method, finishing, fish, fit, forum, legs, mdf, pine, plan, planning, ply, rails, research, rod, sit, stand, support, tank, top
    • Replies: 7
    • Views: 2,149
    Last Post: 5th May 2008 05:43 PM
    by Rodt68  Go to last post

    Forum:
    FINISHING

  46. timber advice and supply - help me build my bed

    Started by gabacus, 19th April 2008 10:44 PM
    27mm, 3.2m, 7.5m, 90mm, advice, bed, build, buy, cheers, constantly, cost, dar, dark, decided, disappointed, finish, gabacus, headboard, hear, love, project, rail, stain, stock, supply, sydney, timber, time, type, wood
    • Replies: 3
    • Views: 1,534
    Last Post: 21st April 2008 10:13 AM
    by TomH  Go to last post

    Forum:
    TIMBER

  47. dar jarrah

    Started by puttypete, 9th April 2008 05:37 PM
    anticipation, brisbane, chose, coast, continue, dar, direct, gold, hardware, jarrah, pete, purchase, regions, stocking
    • Replies: 11
    • Views: 3,398
    Last Post: 18th April 2008 01:42 PM
    by Cruzi  Go to last post

    Forum:
    TIMBER

  48. WTB Marri in Perth

    Started by wajor, 21st January 2008 11:53 AM
    appreciated, build, cheers, dar, design, dining, finalised, happy, hoping, marri, materials, perth, pointers, rough, salvaged, sawn, slabs, source, supplier, surrounding, table, wayne, wtb
    • Replies: 1
    • Views: 1,364
    Last Post: 2nd February 2008 06:01 PM
    by zbigniew  Go to last post

    Forum:
    TIMBER

  49. Cypress posts

    Started by bigwags, 29th December 2007 12:39 PM
    2tsup, appreciated, cracking, cypress, dar, info, minimize, posts, project, required, seal
    • Replies: 6
    • Views: 5,144
    Last Post: 31st December 2007 12:46 PM
    by DJ’s Timber  Go to last post

    Forum:
    TIMBER

Results 1 to 50 of 86
Page 1 of 2 1 2