Search:

Tag: experience

Page 13 of 23 FirstFirst 10 11 12 13 14 15 16

Search: Search took 0.03 seconds; generated 30 minute(s) ago.

  1. Floor sander / polisher in Sydney

    Started by ubeaut, 16th November 2008 07:03 AM
    1/2, 1920s, bedroom, black, boards, bring, carpet, complicate, east, experience, expert, floorboards, happy, hope, hubby, metre, polisher, randwick, recommend, reno, rest, sander, sander/polisher, sanding, south, stain, sydney, tackling, walls, wide
    • Replies: 0
    • Views: 1,838
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  2. Stainless steel and weathering

    Started by ubeaut, 16th November 2008 07:03 AM
    advance, australian, boris, chinese, experience, exposed, finish, finishes, forum, guess, hard, korean, limited, love, miami, mirror, people, performance, posts, reading, sales, satin, speak, stainless, steel, supplied, talk, weather, weathering, wire
    • Replies: 0
    • Views: 1,637
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  3. Removing masonite - oiling floorboards.

    Started by ubeaut, 16th November 2008 07:03 AM
    await, decided, experience, flat, floor, floorboards, glue, house, kitchen, lino/masonite, masonite, muscles, nails, natural, oil, oiling, polishing, pretty, removing, shovel, staples, start, tool, transparent, treasures, treatment, treatments, wood
    • Replies: 0
    • Views: 1,807
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  4. Random Length Decking - how to do the joins?

    Started by ubeaut, 16th November 2008 07:03 AM
    deck, decking, experience, issue, joins, joists, length, lengths, line, purchased, random, randomly, similar, thinking, timber, timbr
    • Replies: 0
    • Views: 2,603
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  5. 180mm x 22mm hardwood boards

    Started by ubeaut, 16th November 2008 07:03 AM
    180mm, 22mm, boards, choose, deciding, experience, flooring, hardwood, hoping
    • Replies: 0
    • Views: 1,462
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  6. noise between adjacent properties

    Started by ubeaut, 16th November 2008 07:03 AM
    2.30am, adjacent, advice, and/or, buys, costs, effective, entertaining, existence, experience, feet, giving, hallway, hell, inherit, life, listening, loud, mounted, party, poor, pounding, products, reaching, rest, selling, spend, sucker, underfloor, wall
    • Replies: 0
    • Views: 1,560
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  7. Deck fastners

    Started by ubeaut, 16th November 2008 07:03 AM
    answers, battern, bearers, cairns, cheers, couple, days, deck, decking, diy, experience, fastners, fixing, gold, ground, hardwood, humidity, level, method, novice, path, planning, references, screws, sire, site, sun, system, upto, wet
    • Replies: 0
    • Views: 1,658
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  8. Dan's low deck.

    Started by ubeaut, 16th November 2008 07:03 AM
    alfresco, brick, brilliant, building, contribute, dans, deck, digging, dozen, drainage, experience, footings, forum, height, holes, i’d, issues, it’s, low, method, pillars, pour, prevents, received, restrictions, saved, share, slab, thread, undergrowth
    • Replies: 0
    • Views: 2,713
    Last Post: 16th November 2008 07:03 AM
    by ubeaut  Go to last post
  9. Square Set or P50 shadowline

    Started by ubeaut, 16th November 2008 06:50 AM
    advice, building, cornice, decision, experience, finishes, gyprock, house, p50, previously, profiles, provide, set, shadowline, square, stage
    • Replies: 0
    • Views: 5,604
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  10. Painting VJs - to fill or not to fill

    Started by ubeaut, 16th November 2008 06:50 AM
    basically, experience, fill, filled, filling, gaps, groove, guess, house, internal, movement, ordinary, painted, painting, paintwork, pine, pretty, product, products, reasonable, repaint, sikaflex, similar, slab, solid, steve, time, tongue, vjs, walls
    • Replies: 0
    • Views: 1,630
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  11. Manual tile cutter or wet saw

    Started by ubeaut, 16th November 2008 06:50 AM
    300, 600, bathroom, bit, cut, cutter, experience, guy, hear, hold, love, manual, matters, nice, option, porcelain, quality, redo, search, shop, starting, suggested, tile, tilers, tiles, toilet, wet, worth
    • Replies: 0
    • Views: 2,179
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  12. Painting walls before floor sanding

    Started by ubeaut, 16th November 2008 06:50 AM
    ahead, bedroom, dust, experience, finished, floor, floors, meantime, paint, painting, polishing, sanding, wait, walls, weeks
    • Replies: 0
    • Views: 2,314
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  13. Wall tiling alternatives

    Started by ubeaut, 16th November 2008 06:50 AM
    advice, alternatives, applied, block, cement, ceramic, experience, gyprock, offer, pigmented, render, sealed, shower, stalls, tiles, tiling, wall, walls
    • Replies: 0
    • Views: 1,136
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  14. Which sander for painted weatherboards

    Started by ubeaut, 16th November 2008 06:50 AM
    contractor, disc, dust, efficiently, experience, extraction, facility, fast, fero150feq, festool, forum, guys, info, job, lead, locally, paint, painted, process, qld, read, recommend, remove, required, requirements, researched, sander, sanding, speed, weatherboards
    • Replies: 0
    • Views: 2,966
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  15. fire rating ceiling

    Started by ubeaut, 16th November 2008 06:50 AM
    10mm, attached, ceiling, cheers, create, csr, desk, dust, existing, experience, fire, fixing, glue, gyprock, ignore, landfill, layer, layers, lot, manualno~, mention, mess, nails, original, presently, reverted, screw, spoke, standard, stop
    • Replies: 0
    • Views: 1,102
    Last Post: 16th November 2008 06:50 AM
    by ubeaut  Go to last post
  16. Do you scrape lacquer?

    Started by jmk89, 25th March 2008 08:42 AM
    accord, application, collection, dry, experience, finishing, frids, hooked, lacquer, piece, raw, reading, results, sandpaper, scrape, scrapers, sense, steel, suggests, surface, tage, talks, thin, timber, tips, volume, wet, wondered, woodworking, wothwhile
    • Replies: 5
    • Views: 2,719
    Last Post: 1st November 2008 05:01 PM
    by mic-d  Go to last post

    Forum:
    FINISHING

  17. Hello

    Started by Den, 27th October 2008 10:12 AM
    build, building, cheers, curve, den, enjoyed, experience, fast, father, forward, furniture, hope, hours, late, learned, learning, newbie, outdoor, perth, priceless, school, setting, shorten, skills, sweeet, sydney, wood, woodworking, words, wrc
    • Replies: 7
    • Views: 1,548
    Last Post: 30th October 2008 03:22 PM
    by munruben  Go to last post
  18. Work wanted.

    Started by tea lady, 17th October 2008 09:51 AM
    appreciated, art, assembly, bit, clean.c, computer, dash, electronic, email, experience, fairly, fit, funny, hold, hour, indoor, job, knowledge, muchly, outdoor, pcb, reading, resume, retail, strong, telecom, time, traffic.p, wanted, work
    • Replies: 13
    • Views: 2,757
    Last Post: 19th October 2008 05:49 PM
    by tea lady  Go to last post

    Forum:
    EMPLOYMENT

  19. Suitable finish for Afrormosia outdoors

    Started by TommyC, 17th October 2008 01:36 PM
    afrormosia, appealing, bench, cop, dining, experience, fade, finish, grey, ideas, left, options, outdoor, outdoors, protect, seat, setting, silvery, spills, stains, suitable, table, teak, time, top, tops, type, unfinished, unlike, wondering
    • Replies: 0
    • Views: 1,380
    Last Post: 17th October 2008 01:36 PM
    by TommyC  Go to last post

    Forum:
    FINISHING

  20. Brisbane Northside Wood Machinist/CNC Operator

    Started by InWood, 15th October 2008 12:44 PM
    ability, brisbane, busy, cabinetry, close, depend, email, experience, extremley, info@inwoodcd.com.au, machinist, machinist or cnc, machinist/cnc, morbidelli, northside, operate, operator, overtime, panel, position, public, resume, suit, time, times, transport, vehicle, wage, wood, workshop
    • Replies: 0
    • Views: 2,087
    Last Post: 15th October 2008 12:44 PM
    by InWood  Go to last post

    Forum:
    EMPLOYMENT

  21. Red Cedar Cabinet - Advice for finishing

    Started by Harry fro Coffs, 5th October 2008 08:30 AM
    2tsup, advice, apprehensive, blotchy, cabinet, cedar, coffs, dark, experience, finish, finishing, found, french, guide, hard, harry, limited, matching, piece, polishing, red, removal, sandpaper, screen, shellac, stains, suggestions, threads, time, wire
    • Replies: 9
    • Views: 2,531
    Last Post: 7th October 2008 09:50 AM
    by jerryc  Go to last post

    Forum:
    FINISHING

  22. Apollo HVLP conversion gun query

    Started by bloggs1968, 25th September 2008 07:20 AM
    7500c, apollo, boats, bog, comments, compressor, conventional, conversion, enamels, experience, finishes, gear, gun, hvlp, job, opposed, packs, paint, phase, primers, query, recently, rid, similar, spray, spraying, tia, turbine, varnish, wondering
    • Replies: 3
    • Views: 3,529
    Last Post: 6th October 2008 05:32 PM
    by durwood  Go to last post

    Forum:
    FINISHING

  23. G'day - All

    Started by Michael M, 1st October 2008 01:37 PM
    accuracy, block, building, club, day, experience, fallen, gday, guys, hope, kid, learn, letting, lots, love, loved, rolleyes, set, share, stuff, wood
    • Replies: 3
    • Views: 1,275
    Last Post: 2nd October 2008 12:34 PM
    by Ed Reiss  Go to last post
  24. Spraying MDF Furniture - Wagner W660

    Started by hitch, 30th September 2008 05:15 PM
    $200, 900x900x450, alternative, appreciated, based, cabinet, coats, comment, enamel, experience, finish, furniture, hand, info, knowledge, looked, mark, mdf, oil, proposing, shelf, spray, spraying, starters, system, task, top, undercoat, w660, wagner
    • Replies: 1
    • Views: 3,885
    Last Post: 1st October 2008 11:01 PM
    by hitch  Go to last post

    Forum:
    FINISHING

  25. G'Day from Nowra

    Started by Aussie_Mick, 24th September 2008 05:07 PM
    aircraft, autocad, building, cnc, communicating, demonstrator, enginner, experience, fellow, forward, gday, hand, lending, love, machine, maintenance, michael, nowra, products, solidworks, stages, trade, triton, wood, woodworkers, woodworking
    • Replies: 5
    • Views: 1,590
    Last Post: 28th September 2008 08:51 PM
    by Bluegum  Go to last post
  26. greetings from a new member

    Started by rodmartin, 22nd September 2008 12:58 PM
    anticipated, apartment, built, cheers, experience, forum, forward, furniture, hope, incorporate, larger, lots, member, move, novice, participating, pieces, post, projects, renovation, rodmartin, set, setting, shop, skills, start, steel, timber, tips, welding
    • Replies: 4
    • Views: 1,267
    Last Post: 23rd September 2008 12:55 AM
    by Ed Reiss  Go to last post
  27. Carbatec loses sale

    Started by damian, 19th August 2008 07:09 PM
    2 Pages
    1 2
    argument, base, call, carbatec, carbatecs, demonstrable, depending, experience, experiences, forum, h&f, loses, lot, people, polite, poor, posts, read, sale, sell, service, solutions, sounded, stocked, stuff, suggest, suppliers, table, timbecon, ttd
    • Replies: 27
    • Views: 5,756
    Last Post: 30th August 2008 12:19 PM
    by Wild Dingo  Go to last post
  28. Hi from a pom!

    Started by Bri_ov_cop, 14th August 2008 10:34 PM
    advice, bit, contribute, cop, experience, forums, head, holly, hope, hoping, joined, live, police, pom, question, username, wood
    • Replies: 9
    • Views: 1,523
    Last Post: 16th August 2008 11:13 PM
    by joe greiner  Go to last post
  29. The First Loser In Beijing - Is An Australian

    Started by Metal Head, 10th August 2008 12:05 AM
    10-minute, arena, aussie, aussies, australian, badminton, beijing, carroll, carrolls, couple, experience, games, happy, language, level, lose, loser, match, minutes, olympic, playing, question, serve, set, shes, sport, time, weeks, won, yulianti
    • Replies: 7
    • Views: 1,850
    Last Post: 10th August 2008 09:20 PM
    by weisyboy  Go to last post
  30. G'day from Melbourne

    Started by Bonsa1, 8th August 2008 07:25 PM
    appreciated, assistance, books, building, cheers, compressor, designs, experience, faced, finish, finishing, forward, gday, gloss, greatly, gun, lots, marine, mdf, melbourne, paint, ply, spray, started, steve, suggest, thinking, veneers, wealth, web
    • Replies: 3
    • Views: 1,320
    Last Post: 9th August 2008 05:59 PM
    by Bonsa1  Go to last post
  31. G'day from Canberra

    Started by slackboy72, 7th August 2008 05:56 PM
    advice, aspirations, assempling, build, building, canberra, draws, estapoling, experience, extends, finish, finishing, fixing, furniture, gday, guitar, guitars, hope, joins, keen, learn, mere, n00b, poorly, pre-fab, previous, repair, robert, shelves, time
    • Replies: 3
    • Views: 1,405
    Last Post: 8th August 2008 11:21 AM
    by mcarthur  Go to last post
  32. C12 Drill My experience with it so far - Done

    Started by HotChips, 5th July 2008 06:01 PM
    alarm, bit, bought, c12, chuck, chucks, drill, experience, feel, fit, front, hand, handed, handle, left, light, love, nicad, prefer, quick, regard, screw, set, setting, stop, suppose, switch, systainer, triton, wrap
    • Replies: 1
    • Views: 2,942
    Last Post: 1st August 2008 08:06 AM
    by klauskvik  Go to last post
  33. G'day from North Sydney

    Started by bshaft, 16th July 2008 02:51 PM
    amount, appreciated, belt, blake, cheers, decent, equipment, experience, gday, lathe, limited, local, love, nice, north, piddly, precision, press, recently, ring, sander, slab, sort, spent, stateside, suggestions, sydney, tools, use/rent, wood
    • Replies: 3
    • Views: 1,480
    Last Post: 16th July 2008 09:18 PM
    by munruben  Go to last post
  34. Couriers????

    Started by gdf26562, 12th July 2008 05:27 PM
    ago, arrival, arrive, buying, call, company, country, courier, couriers, days, difference, due, epoxy, experience, fault, informed, loosing, lost, marine, melbourne, memory, mildura, ply, purchase, qld, rang, site, told, week, word
    • Replies: 4
    • Views: 1,891
    Last Post: 13th July 2008 09:11 PM
    by weisyboy  Go to last post
  35. old nitrocellulose finish on a guitar

    Started by Rod 1944, 17th January 2008 01:49 PM
    2 Pages
    1 2
    advance, advise, bare, black, chips, electric, experience, finish, finishesspirit, grateful, green, guitar, instrument, lacquer, maton, nitrocellulose, oil, repair, repairing, scratches, shelac, sincere, slimline, strip, suggestions, sunburst, taught, varnish, violin, wood
    • Replies: 24
    • Views: 12,000
    Last Post: 9th July 2008 11:36 AM
    by kiwigeo  Go to last post

    Forum:
    FINISHING

  36. Melbourne - CNC Service Technician

    Started by Metal Head, 3rd July 2008 09:44 PM
    addition, candidate, candidates, characteristics, cnc, communicate, communication, contacted, covering, excellent, experience, feel, ideal, join, letter, levels, maintenance, melbourne, minimum, position, possess, resume, role, send, service, shortlisted, similar, skills, team, technician
    • Replies: 0
    • Views: 1,947
    Last Post: 3rd July 2008 09:44 PM
    by Metal Head  Go to last post

    Forum:
    EMPLOYMENT

  37. clear finish for decopauge?

    Started by goodwoody, 21st June 2008 11:00 PM
    acrylic, cards, clear, crystal, damien, decopauge, decopaugespelling, everyones, experience, finish, future, groovers, nitro, opinion, thinking, wattyl, yellowing
    • Replies: 2
    • Views: 1,194
    Last Post: 22nd June 2008 11:33 AM
    by Ashore  Go to last post

    Forum:
    FINISHING

  38. Carba-Tec Adelaide - Now Hiring!

    Started by Carba-Tec, 15th May 2008 04:24 PM
    accepting, adelaide, adelaide@carbatec.com.au, applications, applying, carba-tec, carbatec, computer, customer, essential, experience, focus, format, highly, hiring, inventory, knowledge, myob, office, regarded, resume, sale, send, service, shop, simillar, skills, systems, weeks, word
    • Replies: 3
    • Views: 2,750
    Last Post: 3rd June 2008 02:08 PM
    by Carba-Tec  Go to last post

    Forum:
    EMPLOYMENT

  39. Gas Boosted Solar Hot Water

    Started by an3_bolt, 4th May 2008 04:11 PM
    215, advice, boosted, competitive, electric, experience, gas, hot, house, infinity, kids, litre, people, pricing, purchase, renovating, replace, rinnai, share, size, solar, split, sunmaster, sydney, system, systems, tank, thinking, total, water
    • Replies: 13
    • Views: 2,304
    Last Post: 15th May 2008 04:34 PM
    by dzcook  Go to last post

    Forum:
    PLUMBING

  40. tiler perth

    Started by metamorphesis, 15th May 2008 02:28 PM
    $18, 0404, 169, 723, based, ceramic, email, experience, floors, free, metre, northern, perth, phil, phone, professional, rates, servicing, specialising, start, suburbs, tiler
    • Replies: 0
    • Views: 1,822
    Last Post: 15th May 2008 02:28 PM
    by metamorphesis  Go to last post
  41. Sealing/Finishing Floorboards

    Started by mattwilliams78, 6th May 2008 01:04 AM
    2 Pages
    1 2
    20l, advice, based, bedrooms, buy, cfp, coats, experience, finish, floor, floorboards, floors, found, hire, house, makes, move, paint, painting, post, read, rung, sand, sander, sealing or finishing, tips, total, walls, water, weekend
    • Replies: 20
    • Views: 4,714
    Last Post: 13th May 2008 10:16 PM
    by mattwilliams78  Go to last post

    Forum:
    FLOORING

  42. Rain water bladder tank

    Started by tricky4000, 6th May 2008 03:12 PM
    $2100, 10000ltrs, 8000, b-------, bladder, bladders, bunch, cheaper, cost, dan, decking, experience, guarantee, hard, highly, hold, information, lot, plastic, puncture, rain, sit, source, sun, tank, warehouse, water, welcomed, worthwhile
    • Replies: 5
    • Views: 4,110
    Last Post: 7th May 2008 08:42 PM
    by gsouth  Go to last post

    Forum:
    PLUMBING

  43. Contractors needed to make Bed Slats Sydney Aust...

    Started by SHREKNET, 7th May 2008 02:16 PM
    ability, aust, bed, company, contractors, experience, fold, frames, make, needed, prefer, purposes, slats, storage, sydney, time, venture
    • Replies: 0
    • Views: 1,791
    Last Post: 7th May 2008 02:16 PM
    by SHREKNET  Go to last post

    Forum:
    EMPLOYMENT

  44. Fluted decking...Up or down?

    Started by DrDread, 30th April 2008 11:37 PM
    2 Pages
    1 2
    250, answer, asthetics, boards, build, built, deck, decking, deckingup, definative, existing, experience, facing, fluted, fluting, half, house, joists, life, mildew, personal, preference, prevents, prolongs, replacing, rot, slippery, sq.m, tradies, ventillation
    • Replies: 16
    • Views: 3,763
    Last Post: 7th May 2008 12:26 PM
    by UteMad  Go to last post

    Forum:
    DECKING

  45. Solid Wood Island Benchtop

    Started by JehuAB, 6th May 2008 01:12 AM
    4x4, appreciated, await, bench, benchtop, block, butcher, chunks, construction, decide, experience, fashion, fun, glue, greatly, island, job, lot, massive, pitfalls, possibly, project, references, reno, solid, sort, techniques, top, tops, wood
    • Replies: 8
    • Views: 6,146
    Last Post: 6th May 2008 03:01 PM
    by silentC  Go to last post

    Forum:
    KITCHENS

  46. What you can and can't put on a deck (pot plants)

    Started by PRKLCD, 5th May 2008 08:20 AM
    avoid, couple, deck, drip, experience, feet, plans, plants, posts, pot, pots, presume, question, set, stains, tray/saucers
    • Replies: 4
    • Views: 1,903
    Last Post: 5th May 2008 09:19 PM
    by jimj  Go to last post

    Forum:
    DECKING

  47. exterior stain/oil on cca pine

    Started by slugmacca, 5th May 2008 02:20 PM
    appreciated, brands, cabots, cca, chasing, cheers, couple, doug, experience, exterior, fascia, finish, house, looked, oil/stain, pine, recommendation, sikkens, stain or oil, stain/oil, timbers, verandah, wattyl
    • Replies: 0
    • Views: 2,117
    Last Post: 5th May 2008 02:20 PM
    by slugmacca  Go to last post

    Forum:
    PAINTING

  48. Carpenter required for office benches Mitcham VIC

    Started by mreddie, 20th April 2008 10:02 PM
    asap, association, benches, benches/work, carpenter, company, contact, eastern, eddie, experience, fitouts, floating, install, laminate, legs, measure, mitcham, office, preferably, prices, required, spaces, suburbs, vic, victoria
    • Replies: 1
    • Views: 1,541
    Last Post: 30th April 2008 10:42 PM
    by mick61  Go to last post

    Forum:
    EMPLOYMENT

  49. Construction grade straw bails and sound insulation

    Started by foosion, 29th April 2008 07:17 PM
    advance, advice, afford, bails, build, construction, cut, experience, grade, inside, insulation, job, melbourne, mid, noise, pay, plan, pollution, proper, requirements, shed, short, sound, soundproof, straw, studio, task, term, understand, wall
    • Replies: 10
    • Views: 3,221
    Last Post: 30th April 2008 07:22 PM
    by foosion  Go to last post
  50. looking for work on or around Bribie Island

    Started by hoefler, 29th April 2008 02:54 AM
    advice, age, appreciated, austria, bribie, carpenter, country, days, difficult, employment, english, experience, family, firstly, forum, german, greatly, island, moveing, qualified, queensland, thomas2tsup, tips, unfortunatly, vienna, work
    • Replies: 0
    • Views: 1,761
    Last Post: 29th April 2008 02:54 AM
    by hoefler  Go to last post

    Forum:
    EMPLOYMENT

Results 601 to 650 of 1139
Page 13 of 23 FirstFirst 10 11 12 13 14 15 16