Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 4 of 4
  1. #1
    Join Date
    Feb 2007
    Location
    Sydney
    Posts
    87
    Post Thanks / Like

    Question ridge capping mortar mix

    What is a good ratio of sand, cement and lime for a mortar mix to repair the ridge capping? I will flexipoint afterwards.

  2. #2
    Join Date
    Nov 2007
    Location
    Orstralia
    Posts
    256
    Post Thanks / Like

    Default

    4 brazillion to one if you go by what the roof tilers use from what Ive seen on site.

  3. #3
    Join Date
    Jan 2006
    Location
    Melbourne
    Posts
    722
    Post Thanks / Like

    Default

    My flexi point container recommended 3 sand to 1 cement prior to putting the pointing compound over the top. They've stayed there a week so far if that's any test!!

  4. #4
    Join Date
    Feb 2008
    Location
    Aust
    Posts
    192
    Post Thanks / Like

    Default

    My flexi point container recommended 3 sand to 1 cement prior to putting the pointing compound over the top. They've stayed there a week so far if that's any test!!
    ding ding!

    mix it dry dog poo

    GP Cement

Similar Threads

  1. Shed roofing - ridge capping
    By Vernonv in forum THE GARDEN SHED
    Replies: 5
    Last Post: 10th September 2007, 04:06 PM
  2. Timber Sleeper Capping
    By stumbling dubbo in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 2
    Last Post: 13th December 2006, 11:56 AM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •