Results 1 to 1 of 1
-
16th November 2008, 07:18 AM #1
Raising Concrete by 50mm - fall the wrong way
Hi, I have a concrete path which connects on the same level to a concrete slab which meets my front door and driveway that falls towards the door and not away from it. When it rains the water runs towards the house and pools against the house wall and front steps up to the front door. My question is: Is there anyway of raising the concrete in sections to make it the highest point so the water drains away from the house? Thanks
More...
Similar Threads
-
Holesaw size for 50mm PVC?
By montiee in forum PLUMBING, ELECTRICAL, HEATING, COOLING, etcReplies: 9Last Post: 29th March 2008, 01:31 PM -
Cheap options for raising floor 50mm
By TonyD in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etcReplies: 9Last Post: 11th January 2008, 09:01 PM -
Raising garage to pour concrete
By scout32flc in forum CONCRETINGReplies: 1Last Post: 7th January 2008, 08:08 PM -
Lifting a Toilet Pan about 50mm
By echnidna in forum PLUMBING, ELECTRICAL, HEATING, COOLING, etcReplies: 7Last Post: 16th August 2006, 08:19 AM -
Talk about wrong place at the wrong time....
By silentC in forum NOTHING AT ALL TO DO WITH RENOVATIONReplies: 8Last Post: 25th October 2005, 11:51 PM
Bookmarks