Long story short
I'm erection a 6x9 kit shed
Sheds bought, Site is sort of leveled, Permits approved.
After being ripped off by the excavation Company (thats another story) Funds are very limited So Ive decided to have a go at pouring the slab myself with the help of a mate (In exchange for some electrical work)who has done a bit of concreting work before

I realize I have to box it up lay reo mesh etc
but what size reo how many chairs per mesh sheet does the reo sheets need to be a attached to each other
I another word what do I do now
Also are they strict on what is called the fence line (IE is it the edge of the upright,My side of the palings, the centerer of the paling etc).

What material do I use to box it up (form ply is what I was going to use untill I priced it)
Do I need to lay plastic sheet first
What about Sand??

As you can see I'm struggling here as getting a concreter in is not an option anymore