Hi all,

I am currently renovating my bathroom and wish to move the 2 existing floor wastes.

Firstly, I want to centre the shower waste, therefore will need to move it about 200mm from its current location.

Secondly, I wish to use an existing floor waste for a vanity and floor waste. Floor waste will need to be about 800mm from existing location while vanity drain will be about 200mm away.

Questions:
1. Can I cut away concrete install elbow to pipe run it to desired location then install another elbow so pipe sticks out at desired location then concrete over?

2. Can I connect a vanity waste to a floor waste (see attachment)?

Attached Thumbnails



Read the full thread at RenovateForum.com...