    Hi
    building a pool and the builder has sugested to lay
    a larger tile around pool (32 mpa concrete)
    new concrete is 200mm wide X 150mm high 22 metres long
    how many metres of concrete is needed??
    any idea how much should it cost for this new concrete??
    they have sugested $2200 including steel reinforcement

    Thank you

  2. #2
    Join Date
    Nov 2005
    Location
    Kilsyth
    Age
    66
    Posts
    301

    Default

    Quote Originally Posted by ger View Post
    Hi
    building a pool and the builder has sugested to lay
    a larger tile around pool (32 mpa concrete)
    new concrete is 200mm wide X 150mm high 22 metres long
    how many metres of concrete is needed??
    any idea how much should it cost for this new concrete??
    they have sugested $2200 including steel reinforcement

    Thank you
    Depending on where you live, but around here (Melbourne outer eastern suburbs)

    .2 x .15 x 22 = 6.6 m3 of concrete at about $170 per m3 = $1122
    4 lengths of F11 4bar, about $30 per length = $120
    So about $1240 for materials, so the $2200 for doing the job (including materals) sounds about right
    .
    or are they telling you that $2200 is for just the concrete & reo ?

  3. #3
    Join Date
    Jun 2007
    Location
    Melbourne
    Posts
    31

    Default

    Hi Terian
    they are building the pool
    so they are only adding the extra edge of concrete
    whilst laying rest of pool
    steel is just going to be made longer to
    cover extra length
    lying tile has already been costed
    with pool instalation
    any idea how many linear metres
    it is
    I can not work it out
    they have been working in lenear metres for pool
    PS
    I live in SE Inner suburbs Melbourne


    thank you

  4. #4
    Join Date
    Nov 2005
    Location
    Kilsyth
    Age
    66
    Posts
    301

    Default

    Quote Originally Posted by ger View Post
    Hi Terian
    they are building the pool
    so they are only adding the extra edge of concrete
    whilst laying rest of pool
    OK, so the labour is included, then their $2200 is about right.

    steel is just going to be made longer to cover extra length
    OK, so the pool and the surround is one piece, thats fine (good actually)

    l
    ying tile has already been costed with pool instalation
    any idea how many linear metres it is
    I can not work it out they have been working in lenear metres for pool
    PS
    I live in SE Inner suburbs Melbourne
    thank you
    linear meters is just the length, you can't convert m2 or m3 to linear too easily, for the tiles, if they are the same width as the concrete, then it would be 22 linear meters, if they are 1/2 the width, it would be 44 linear meters and so on

    (if I have screwed that up, someone will come along and correct me ) )

  5. #5
    Join Date
    Jun 2007
    Location
    Melbourne
    Posts
    31

    Default

    Thanks Terrian
    I rang Boral before I posted here and
    I gave them above measurements for
    concrete and I was told I the cost for
    concrete was $400 only she maust have
    made a mistake on calculation

  6. #6
    Join Date
    Nov 2005
    Location
    Kilsyth
    Age
    66
    Posts
    301

    Default

    Quote Originally Posted by ger View Post
    Thanks Terrian
    I rang Boral before I posted here and
    I gave them above measurements for
    concrete and I was told I the cost for
    concrete was $400 only she maust have
    made a mistake on calculation
    yep (or I have, one or the other )

Similar Threads

  1. deck ontop of concrete steps
    By oricenap in forum CONCRETING
    Replies: 2
    Last Post: 25th June 2007, 09:25 PM
  2. Pool Renovation Blog
    By spartan in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 15
    Last Post: 1st October 2006, 06:01 PM
  3. Planning a Pool Deck
    By Clive McF in forum DECKING
    Replies: 6
    Last Post: 14th May 2006, 12:35 AM
  4. How to concrete posts/brackets into place?
    By ptyltd in forum CONCRETING
    Replies: 5
    Last Post: 20th January 2006, 01:07 PM
  5. Concrete over concrete
    By Sir Stinkalot in forum CONCRETING
    Replies: 4
    Last Post: 18th July 2003, 10:59 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •