Thanks: 1
Likes: 3
Needs Pictures: 0
Picture(s) thanks: 0
Results 1 to 7 of 7
-
25th May 2014, 12:08 AM #1Intermediate Member
- Join Date
- Nov 2011
- Location
- melbourne
- Posts
- 49
big recylced iron bark whart timbers
thought I would start a new thread as my previous post on the process involved in getting these posts into shape has gone on a bit and to save anyone the pain or reading I have started a new thread showing the posts in their dressed form. the pics herein show the posts being put in place by a spider crane on their 300mm T stirrups in 800 deep concreted pads. the way we connected the top beams into the posts was to drill through and sledge hammer 500mm deformed bar as big nails. now with the roof on they are firmly inplace will post more complete pics tomorrow
-
25th May 2014, 01:55 PM #2
No no No
Not enough pictures and detail here, I need more
Great lookiing thread here, surprised no one has commented.
Any other pictures, please post
Cheers
Willy
-
25th May 2014, 02:11 PM #3
Okay, sorry, just found your other thread with the epic bolt removal
Excellents threads
Willy
-
26th May 2014, 12:03 AM #4Intermediate Member
- Join Date
- Nov 2011
- Location
- melbourne
- Posts
- 49
Here are more pics of the almost finished outdoor room showing the posts and the spotted gum decking
the decking was oiled today with cudek so its still drying
outdoor kitchen and bbq going in soon with a concrete bench
i extended the deck all around the posts it looks very neat
-
27th May 2014, 11:17 PM #5Intermediate Member
- Join Date
- Nov 2011
- Location
- melbourne
- Posts
- 49
more pics of the posts
-
27th May 2014, 11:21 PM #6Novice
- Join Date
- Feb 2014
- Location
- Australia
- Posts
- 18
That's what I call a masterpiece!
i wish I was that talented, but I don't think my patience (ro my wife's) would be able to take on such a big big project
Very impressive I must say, well done!
-
5th June 2014, 01:41 AM #7
I just caught this thread. Thank you for the update the timber posts have come up looking spectacular.