Grinding a concrete slab
Getting our floors done at the moment. Part of the house is the traditional bearers and joists - they butt up against the back room in the house which is on a concrete slab. We are laying yellowtongue then Sydney Bluegum on top and wanted to continue the bluegum onto the back room slab.
We have been told that for the wider boards (130mm) we need to lay the bluegum onto yellow tongue as well over the top of the concrete slab, however this is going to bugger up our levels. The slab + yellowtongue + the floorboards is going to be about 30 or 40mm higher than the rest of the house. We really want the whole thing flush if we can as a 30mm step is going to look stupid.
So I want to get someone to grind 30mm or so off the slab. My question is, is this feasible and if so, how much would I be looking at paying to get this done? The room is about 4m x 7m.
Thanks in advance.
-
23rd August 2005, 11:14 AM #2
I think grinding 30mm of the top of a slab would be difficult and would take a long time and make a lot of dust.
If the slab is going to be covered it would be better to hire a jack hammer and scabble the 30mm off. It will be quicker.
-
23rd August 2005, 11:56 AM #3Senior Member
- Join Date
- May 2005
- Location
- Melbourne
- Posts
- 149
Originally Posted by Barry_White
If I get it jackhammered, is that something I could do myself? Then can you put that self levelling stuff over the top of a roughly jackhammered slab?
Thanks
-
23rd August 2005, 12:10 PM #4
You could most certainly do the scabbling yourself and then I would think it would be better to just top it off with a sand and cement mix using something like Bondcrete to get it to adhere to the concrete slab. You could perhaps get a Ceramic Tile layer to do a topping for you.
The self leveling product is usually used in situations where you have dips and hollows in a concrete slab where you want to get it level to lay lino or cork.
-
23rd August 2005, 12:29 PM #5
vGolfer,
How deep is the reo' mesh in your slab? I would be concerned about hitting/exposing it.
Cheers,
Jill
-
23rd August 2005, 12:36 PM #6Senior Member
- Join Date
- May 2005
- Location
- Melbourne
- Posts
- 149
Originally Posted by Jill
-
23rd August 2005, 12:46 PM #7Originally Posted by vGolfer
More importantly is the slab on the ground or is it suspended and how thick is the slab.
-
23rd August 2005, 12:49 PM #8Senior Member
- Join Date
- May 2005
- Location
- Melbourne
- Posts
- 149
Originally Posted by Barry_White
-
23rd August 2005, 01:37 PM #9
I did what you are planning about 2 years ago. It wasn't really that hard, although I only took off about 30mm.
What I did with an angle grinder was to cut 30mm grooves in the concrete about 150mm apart in a chequered fashion. Then with a Kanga and the spade bit, lift off the top 30mm. Finish off with a lump hammer and comb chisel. I only had to do an area of about 4 sq meters. It took a couple of hours.
Pretty dirty job tho, cement dust everywhere.
Your main potential difficulty is the depth of the reo, as everyone says
Good luckBodgy
"Is it not enough simply to be able to appreciate the beauty of the garden without it being necessary to believe that there are faeries at the bottom of it? " Douglas Adams
-
23rd August 2005, 02:20 PM #10GOLD MEMBER
- Join Date
- May 2003
- Location
- Central Coast, NSW
- Posts
- 614
I've done it the same way as Bodgy. Difference was that I cut the grooves with the angle grinder about 50mm apart, in both directions. The bits between each groove just popped off as a single square chip when the jackhammer got under them. The negative was that I could scarcely see for the dust. Horrible job.
If I were in your position I would definitely do it - though I dont think a 30mm step is really that noticeable in practice.
Just a thought (probably a stupid one), could you cut the grooves with a concrete saw, and thus get it over with quickly. I know some of them have depth stops.
Arron
-
23rd August 2005, 02:45 PM #11
Yep, Aaron's correct, a concrete saw would be far better and more accurate too in depth. Less dusty but you get a cement slurry evrywhere instead.
Incidentally, you'll know if your reo is set high - Guy Fawkes night!!!!Bodgy
"Is it not enough simply to be able to appreciate the beauty of the garden without it being necessary to believe that there are faeries at the bottom of it? " Douglas Adams
-
23rd August 2005, 06:20 PM #12SENIOR MEMBER
- Join Date
- Aug 2005
- Location
- Victoria
- Posts
- 412
I wouldn't be taking 30mm off if I was you.You will destroy the structural integrity of the slab.It is highly probable that you will expose the top mesh and have to cut it out.Not good.And you will be reducing the slab and beam thickness by 30mm.Again,not good.the slab is a certain thickness for a reason.
Tools
-
23rd August 2005, 10:44 PM #13
VGolfer,
If your slab is only 100mm thick, as some are, you may need to rethink, also. Our slab has pexel piping for inslab heating laid on the reo', so we won't be going near our slab with a drill, let alone a jackhammer!!! I've drawn up a colour coded plan with every measurement for built-ins recorded carefully. NO ONE is allowed to touch the slab without consulting THE PLAN!!!!
Is this section a full extension (i.e. without a 'doorway') of a living area? If not, you could perhaps taper the slab in the entry area, to form the timber flooring into a shallow ramp?
What about terracotta tiles - (although levels still could be out, there), with timber look tiles framing them (in blocks of four, on the diagonal - think of the fun you could have laying them!!!) to help tie it all in? Just a suggestion that may not be an option, though.
If all else fails, just jack the house up!!!
Cheers,
JillLast edited by Jill; 23rd August 2005 at 10:46 PM. Reason: change
-
23rd August 2005, 11:01 PM #14
vGolfer,
Two other options come to mind:
<O</O
1 - Raise the bearer and joist section of the house by 30mm to compensate, using 30mm battens over each joist.
<O</O
2 - Why use yellow tongue over the slab? I know people who fix hardwood floors straight over concrete. Well I know one person who did this, absolute beginner with the help of a carpenter brother in law. beautiful floor resulted.
<O</O
Personally, I would go with option 1, would anyone miss 30mm doorway height?
<O</O
And I agree with some of the other posts, watch out for rio and don’t degrade the slab integrity. And sounds like a bugger of a job for the size area you are talking about.
<O</O
Having said that, the 30mm step would bother me no end. So I see why you want to make it all level.
-
24th August 2005, 12:51 AM #15
vGolfer,
concrete is not cheap and I doubt that your floor has any more than the bare minimum of the requirement for thickness. Even if you do have 30 or 40mm to burn it will very likely reduce the topcover for the steel. The eventual outcome might be structural failure of the slab and that section of the walls and roof :eek: . It's not that likely but I bet you won't find an engineer that will stake his professional indemnity insurance on it
Mick the cautious"If you need a machine today and don't buy it,
tomorrow you will have paid for it and not have it."
- Henry Ford 1938
Similar Threads
-
Concrete Slab Insulation
By dallas in forum CONCRETINGReplies: 10Last Post: 11th June 2007, 07:05 PM -
Extending a concrete slab
By princhester in forum CONCRETINGReplies: 8Last Post: 24th July 2005, 08:49 PM -
Curing Concrete Slab
By Metung in forum CONCRETINGReplies: 6Last Post: 27th May 2005, 11:27 AM -
Concrete slab for garden shed
By Programmer in forum CONCRETINGReplies: 15Last Post: 26th September 2004, 08:41 AM -
Pine decking on existing concrete slab
By gideOn in forum DECKINGReplies: 15Last Post: 6th February 2004, 08:07 AM
Bookmarks