Results 1 to 4 of 4
-
16th August 2007, 03:04 PM #1
Suspended Concrete Floor Demolition
I am shortly hoping to undertake the demolition of a part of our house to enable the construction of a new kitchen area more sympathetic with the rest of the house.
The proposed demolition is of a 2.5m x 6.1m skillion roofed fibre cement monstrosity.
My question is in regards to the best way to remove the concrete floor located on isolated brick piers that will remain after the roof, walls and framing are removed. At it's highest point it is about 900 from the ground.
Your help would be appreciated.
-
16th August 2007, 06:12 PM #2SENIOR MEMBER
- Join Date
- Aug 2005
- Location
- Victoria
- Posts
- 412
4 ton excavator @ $90 per hour
Breaker attachment @ $120 per day
Tools
-
16th August 2007, 06:27 PM #3
Wot Tools Sez, except if you can get a bigger excavator, do so.
There's just no point in mucking round. Anything less and it'll cost you more.
Don't forget if the fibre cement is actual Asbestos Cement, you'll need licenced demolition guys for that.
Cheers,
P
-
16th August 2007, 07:01 PM #4
thanks for that - know the asbestos rules
I think i'll get a couple of quotes from the demolition experts
ta
Lawso
Proposing to OB - god am I crazy???
Similar Threads
-
Levelling small area of concrete floor
By Mcblurter in forum CONCRETINGReplies: 7Last Post: 10th September 2007, 01:52 PM -
deck ontop of concrete steps
By oricenap in forum CONCRETINGReplies: 2Last Post: 25th June 2007, 09:25 PM -
How to concrete posts/brackets into place?
By ptyltd in forum CONCRETINGReplies: 5Last Post: 20th January 2006, 01:07 PM -
Suspended Concrete floor
By HappyHammer in forum CONCRETINGReplies: 9Last Post: 6th January 2006, 08:26 AM -
Concrete over concrete
By Sir Stinkalot in forum CONCRETINGReplies: 4Last Post: 18th July 2003, 10:59 PM
Bookmarks