    Default Bathroom renovation - pre-tiling preparation advice please

    Hi,
    We are renovating our bathroom, toilet and laundry and I need some fairly urgent advice on pre-tiling wall preparation.

    We have a brick veneer house in Sydney, circa 1963. The 'wet rooms' are all original. The current construction in these rooms is brick to the 1.4 meter mark, rendered and then tiled. Above that is a stud wall with plaster-and-lathe lining to the ceiling. My intention is to remove the tiles leaving the bricks and rendering as it is. Then I will remove the plaster-and-lathe and replace it with Villaboard, and tile from floor to ceiling.

    My question is about the villaboard. Looking in the manual, it describes the joining process. It looks pretty complicated – using tape and multiple coats of various types of jointing compounds. My question is about the toilet. Because it isn’t really a ‘wet room’, and because the villaboard will only be on the top half of the wall, do I really need to do all this ? What is the minimum jointing procedure that I need to do ? In fact, why do I need to joint the walls at all, if its all going to be covered in tiles ?

    I am keen to minimize the work needed in wall preparation as I am a really hopeless plasterer.

    thanks
    Arron

  2. #2
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    63
    Posts
    2,026

    Default

    Arron,
    If you are covering the walls completely with tiles it's not neccesary to use villaboard with flushed joins. Just use Hardiflex. Also, I'd be thinking about running it straight over the top of the existing plater and lath if possible.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  3. #3
    Join Date
    Aug 2003
    Location
    Melbourne - Outer East Foothills
    Posts
    1,557

    Default

    Quote Originally Posted by Arron
    . My question is about the toilet. Because it isn’t really a ‘wet room’,
    It is in my house
    If at first you don't succeed, give something else a go. Life is far too short to waste time trying.

  4. #4
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    63
    Posts
    2,026

    Default

    Quote Originally Posted by Gumby
    It is in my house
    Gumby,
    maybe you should sit down :eek: (or learn how to aim a bit better )

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  5. #5
    Join Date
    Aug 2003
    Location
    Melbourne - Outer East Foothills
    Posts
    1,557

    Default

    Quote Originally Posted by journeyman Mick
    Gumby,
    maybe you should sit down :eek: (or learn how to aim a bit better )

    Mick
    I was sitting down
    If at first you don't succeed, give something else a go. Life is far too short to waste time trying.

  6. #6
    Join Date
    May 2003
    Location
    Central Coast, NSW
    Posts
    614

    Default Thanks Mick

    going ahead straight over the plaster-and-lathe. That will save me a few hours.

    Arron

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •