Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 4 of 4
  1. #1
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    4

    Default Retaining Wall slope

    I am installing an ironbark (hardwood) sleeper wall. It varies in height between 600 to 800mm high and has posts on the outside of the wall.
    I have done a lot of investigation and found the best information source provided by Timber QLD. Timber Garden Walls

    From previous postings on this forum and this tech sheet it advises that the wall should be on a 10 degree slope to handle the backfill presure. I am happy to do this however am unsure what to do with the corners. I have 4 90 degree corners and am wondering how each side will join without gaps appearing at the bottom.

    As per the illustration in the tech sheet I have 2 posts on either side of the corner (right on the edge).

    Two ways I can think of is to cut the posts to allow them to butt together allowing for the 10 degree slope of the adjoining wall. Or the second is to move the posts back from the corner and cut the wales (horizontals) to meet without gaps.

    I hope this makes sense as it is very hard to describe an idea in writing

    Cheers
    Bjorn

  2. #2
    Join Date
    Oct 2006
    Location
    Tallahassee FL USA
    Age
    82
    Posts
    0

    Default

    As I understand it, you want to have intersecting batters at the corners. I suggest placing the SECOND post from each corner at the allowable wale length from the corner. Connect the full-length intersecting wales with compound miter or butt joints according to your taste as they show for garden edges. Place the FIRST post from each corner at about one-fourth the distance to the second post. This would provide pretty much the optimum balance of stress in the wales. Cutting the end posts according to your first concept would likely weaken them too much.

    Joe
    Of course truth is stranger than fiction.
    Fiction has to make sense. - Mark Twain

  3. #3
    Join Date
    Jun 2007
    Location
    sydney
    Posts
    121

    Default

    Quote Originally Posted by BjornMiller View Post
    .....this tech sheet advises that the wall should be on a 10 degree slope to handle the backfill presure.
    I think a 1 in 10 slope as the article suggests is different from a 10 deg pitch


    **Edit I see that it mentions 1 in 10 batter for walls over 400mm which is a tad short of 6deg. It does show 1 in 6 batter in the diagram for the ground level above and below the wall which is close enough to 10deg but the actual retaining wall doesnt need to be 10deg.

    Going back to Year 10 Trigonometry 1:10 batter equals a 5.7deg.

  4. #4
    Join Date
    Jan 2008
    Location
    Canberra
    Posts
    4

    Default

    Thanks guys for the reply - I assumed as much with the corners so someone else thinking along the same line is much appreciated.

    And thanks for being precise Tubby.

Similar Threads

  1. Retaining wall
    By Paul2012 in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 3
    Last Post: 19th September 2007, 02:20 PM
  2. Not really a retaining wall
    By oohsam in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 6
    Last Post: 17th September 2007, 11:46 PM
  3. low retaining wall
    By laynlo in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 1
    Last Post: 13th February 2007, 09:20 AM
  4. Retaining wall
    By Marc in forum RETAINING WALLS
    Replies: 1
    Last Post: 7th November 2004, 09:04 AM
  5. Retaining wall
    By himzol in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 18
    Last Post: 26th October 2004, 01:07 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •