Results 1 to 3 of 3
-
4th October 2023, 12:05 AM #1Intermediate Member
- Join Date
- Apr 2015
- Location
- Newcastle, NSW, Australia
- Posts
- 25
bathroom screed before or after wall frames
Renovating a house that had termite damage so reframing the house, planning on bathroom floor with micro-cement. Does one screed before frames are stood or after?
-
4th October 2023, 07:30 AM #2GOLD MEMBER
- Join Date
- Apr 2018
- Location
- Nsw
- Age
- 64
- Posts
- 558
After, otherwise you will need to cut your wall frames to suit the fall to get them level. You also typically screed after the wall linings are installed with waterproofing done first but can be after as well
-
10th October 2023, 07:12 AM #3Intermediate Member
- Join Date
- Apr 2015
- Location
- Newcastle, NSW, Australia
- Posts
- 25
Thanks Beardy. 🍻
Similar Threads
-
Removing bathroom floor & screed
By Bearman in forum BATHROOM & TOILETReplies: 6Last Post: 10th March 2008, 02:23 PM -
bathroom floor screed
By cabman in forum PAINTING, PLASTERING, TILING, DECORATING, etc.Replies: 1Last Post: 5th December 2007, 08:13 AM -
Does screed needed for the bathroom floor?
By tiant in forum KITCHENS, BATHROOMS, THEATRES, etcReplies: 2Last Post: 29th November 2006, 09:13 AM -
Help!! screed bathroom floor
By danger005 in forum KITCHENS, BATHROOMS, THEATRES, etcReplies: 8Last Post: 13th September 2006, 04:17 PM -
dilemna re bathroom floor screed removal
By samhorr in forum KITCHENS, BATHROOMS, THEATRES, etcReplies: 1Last Post: 22nd August 2006, 11:33 PM
Bookmarks