have a friend thats thinking of moving her shower to a area of already laid cement slab but thaTS already on the ground minal fall to outside drains so shower \base would need to be built up what would be the fall needed to do this withour jackhammering a groove hru the floor ?
for the pipes


Read the full thread at RenovateForum.com...