Results 1 to 1 of 1
Thread: Deciphering footing plan
-
16th November 2008, 07:03 AM #1
Deciphering footing plan
Hi there,
I am in the middle of putting up a portal frame, and have posted a query before about the hole- now sorted out.
My next question regards the engineer's drawing of the pier footing reinforcing. I'd be OK if I had a top or side view to work with!
Anyway it appears there are 4 lengths of thicker reo (N12) running parallel with the RHS, forming corners of a box, but what do the zig-zag lines represent- "ligs"? Thinner reo (R6) I realise, but does it form a continuous spiral running around the 4 verticals, or just a zig-zag on 1 side, 2 sides, or 4 maybe, meeting up with them?? And how, if at all, does that structure join the RHS? My only idea is the two N12 bent into a U, which are to be welded to the RHS must join it somehow. "Bend into footing" is the description, so maybe just hooked into place?
And what is the difference between N and R reo bar, is it critical?
Thanks in advance!
Attached Thumbnails
More...
Similar Threads
-
Pad Footing Size
By Paulh in forum SUB FLOORINGReplies: 2Last Post: 26th April 2008, 02:37 PM -
Stone footing repair
By mark b in forum CONCRETINGReplies: 4Last Post: 5th May 2007, 02:13 PM -
Footing Design
By ptyltd in forum FLOORING, DECKING, STUMPS, etc.Replies: 4Last Post: 10th January 2006, 05:20 AM
Bookmarks