    I'm about 20kms from Toowoomba, what should I look under in the yellow pages?

  2. #32
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    69
    Posts
    1,133

    Default

    Quote Originally Posted by funkychicken View Post
    I'm about 20kms from Toowoomba, what should I look under in the yellow pages?
    I just Googled
    reinforcing steel Toowoomba
    and got about three hits

    what you should look for depends on what you intend building and that should be shown on your plans.

    are your piers reinforced?
    if so what is the specified reinforcing?
    How are the timber stumps attached to the piers?
    what tie downs do you need?

    From what you've described here and elsewhere sounds pretty straight forward once you get 400mm off the ground.
    Getting there from 3000mm below the surface could be the tricky bit.

    I must admit I don't like the idea of stopping the concrete and starting the timber stumps 500mm below the natural surface — to me it sounds too much like a dinner invitation to the termites plus potential problems from the reactive soil backfilled against the timber stumps.
    Can you elaborate?
    regards from Alberta, Canada

    ian

  3. #33
    Join Date
    Jul 2009
    Location
    Sydney
    Posts
    0

    Default

    We've just had to put in a similar foundation for our house. 48 of the b*ggers all 300mm diam and between 2.5m and 3.5m down.

    Excavator or bobcat with earth auger is the answer. As the augur goes deeper, they undo the drive shaft and attach an extension and keep going.

    Assuming you have to put re-bar down the hole as well. What our builder did was wire up the assemblies and had the concrete truck onsite. Excavator comes through, bores the hole, apprentice drops the reo in and holds it while concrete truck follows and fills it, 10mins per hole thanks for coming. I think 3 days and the whole job was complete

    What that did was saved cost on cardboard or steel columns to stop collapses and meant the site was much safer as there were no holes at the end of each day.

    Edge beams, waffle and slab followed, which raised us 200mm out of the ground, but probably more than you need to do by the sounds of it. I'd suggest approaching it like we did but maybe leaving the concrete 500mm from the top and dropping in your (presumably) concrete stumps inside the reo and pouring the rest the next day.

  4. #34
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    69
    Posts
    1,133

    Default

    Quote Originally Posted by Greggy1 View Post
    I'd suggest approaching it like we did but maybe leaving the concrete 500mm from the top and dropping in your (presumably) concrete stumps inside the reo and pouring the rest the next day.
    This is not a good idea as it induces a hinge and largely defeats the purpose of digging the 3m deep hole in the first place.
    regards from Alberta, Canada

    ian

  5. #35
    Join Date
    Jun 2007
    Location
    Toowoomba, Qld
    Age
    31
    Posts
    0

    Default

    One detail on the plans says "4/N12 Bars. 75 Cover."

    I'll take a piccy of the plans tomorrow.

    The post go into the concrete, the concrete surrounds the posts

  6. #36
    Join Date
    Feb 2005
    Location
    Mackay Qld
    Age
    50
    Posts
    1,039

    Default

    what about ligs? 4/N12 bars need to be tied together to go in a hole.
    Mick

    avantguardian

  7. #37
    Join Date
    Jun 2007
    Location
    Toowoomba, Qld
    Age
    31
    Posts
    0

    Default

    Ligs? There's an added note, "R6 Ties at 600crs Only if required to maintain specified coverage and spacing of bars"

  8. #38
    Join Date
    Feb 2005
    Location
    Mackay Qld
    Age
    50
    Posts
    1,039

    Default

    that'll be them. It may be hard to keep separation and cover on the bars three metres down a little hole.
    Mick

    avantguardian

  9. #39
    Join Date
    Aug 2005
    Location
    Cranbourne West
    Age
    72
    Posts
    0

    Default

    How's the foundations coming along FC?
    To grow old is inevitable.... To grow up is optional

    Confidence, the feeling you have before you fully understand the situation.

    What could possibly go wrong.

  10. #40
    Join Date
    Jun 2007
    Location
    Toowoomba, Qld
    Age
    31
    Posts
    0

    Default

    Well I've been thinking (or more correctly, my parents have been insisting) that instead of building a shed here I could buy a cheap bit of land (Unofficially subdivide a mates block) and stick it there, then put a house next to it.

    So no holes in the ground yet. If I can't get a cheap bit of land then the shed will go here in Meringandan

  11. #41
    Join Date
    Feb 2003
    Location
    back in Alberta for a while
    Age
    69
    Posts
    1,133

    Default

    Quote Originally Posted by funkychicken View Post
    Well I've been thinking (or more correctly, my parents have been insisting) that instead of building a shed here I could buy a cheap bit of land (Unofficially subdivide a mates block) and stick it there, then put a house next to it.

    So no holes in the ground yet. If I can't get a cheap bit of land then the shed will go here in Meringandan
    be very careful, and pay for very good advice, if you really intend going down that path
    because if you do "officially" every thing you build will belong to your mate
    regards from Alberta, Canada

    ian

Similar Threads

  1. Digging out old sleepers
    By pwerda in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 2
    Last Post: 25th October 2006, 07:06 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •