more progress.....
OK.....I spent a bit of time getting a few more things ordered from suppliers....a couple of acme nuts are on their way. picked up a couple of sprockets and a chain to drive the vertical drive mechanism. spent a bit of time this weekend getting one side of the vertical wind gear connected. The tolerances are pretty minimal so I cant really test the efficiency of the winding unit until I have the other side fixed in place and have the chain connecting the two acme threads installed. I had a go at the main base. Now that moved long at a cracking pace.
...................sorry there isn't any large log being cut up at the present...but hopefully these construction shots will make way for some nice milling images in due course.......
-
9th September 2014, 10:34 PM #17
Member
- Join Date
- Apr 2009
- Location
- brisbane, australia
- Age
- 58
- Posts
- 0
still moving forward
Hi All,
i've had this build on hold for a couple months as I've had an overseas assignment that needed my attention and physical presence. Should be back onto the build shortly. Had to get my hands on a better mig welder. Thats now sorted and likley to get this build going again....apologies..