Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 3 FirstFirst 123 LastLast
Results 16 to 30 of 31
  1. #16
    Join Date
    Dec 2007
    Location
    Perth
    Posts
    16

    Default

    at a guess, somewhere around the $18,000 mark for the job, a lot can depend on how much the concreters charge, you need to shop around, some deal only in house slabs and can be reasonably priced
    reo, bar chairs, trench mesh etc shop around, prices can vary widely, you may find yourself easily saving a few hundred $$, garden / building supplies (here at least) usually carry reo, trench mesh etc
    http://www.google.com.au/search?hl=e...cr%3DcountryAU may be of help.[/quote]

    On them money my quote is $18000.00 exactly. The puzzling thing is I spoke to a guy around the corner from me who had his slab poured around 3 months ago and his slab was 300m2 and he paid $13000.00. Same class site with thickenings and footing detail. The contractor did not use a pump but this is costs around $1000.00 ??. Looks like I have some more homework to do.

  2. #17
    Join Date
    Oct 2006
    Location
    Armidale NSW
    Age
    53
    Posts
    299

    Default

    We had a shed slab done. It was 7.5 x 12, with thickened edge all round and cost a tad over $75/m2. That included 4 rather deep post footings. It was a level site, pretty easy access, and the concreters did everthing.
    Cheers.

    Vernon.
    __________________________________________________
    Bite off more than you can chew and then chew like crazy.

  3. #18
    Join Date
    Dec 2007
    Location
    Newcastle
    Posts
    18

    Default

    On them money my quote is $18000.00 exactly. The puzzling thing is I spoke to a guy around the corner from me who had his slab poured around 3 months ago and his slab was 300m2 and he paid $13000.00. Same class site with thickenings and footing detail. The contractor did not use a pump but this is costs around $1000.00 ??. Looks like I have some more homework to do.[/quote]

    That works out to be $43 a square meter. Sounds like someone is telling porkies. Thats pretty much cost,if that, and a good way to go broke. Slabs aren't fun to do and can be tricky, not to mention hard work. There is only one chance to get it right. Any one can concrete but not everyone can get themselves out of the &^@# if things start to go pear shape.

    Looks like the prices vary slightly in different places in Oz. On average, $80-$85 seems the norm. Supply and demand plays a big factor by the looks of it.

  4. #19
    Join Date
    Feb 2006
    Location
    united pest managers or Australia
    Posts
    121

    Default

    Quote Originally Posted by DJ's Timber View Post
    Uhmm, correct me if I'm wrong here Ivan, but I think Ivan's slab is for a shed with steel frame and cladding, therefore termite protection would not be needed.
    As long as he doesnt line it with plaster, or use any wooden cupboards around the penerations and also uses some sort of wiring in the walls that termites wont chew through, i guess he maybe alright.
    If its just a shed

  5. #20
    Join Date
    Dec 2007
    Location
    Perth
    Posts
    16

    Default

    I have costed everything up and I get $12173.78 in materials only.
    45m3 @ $187.00 m3 inc gst m3 = $8415.00
    26 sheets trench mesh @ $32.67inc ea = $693.42
    17 sheets SL72 mesh @$80.08inc ea = $1361.36
    chairs 100 qty @ $38.50
    Boom pump 3 hrs $1137.50
    Mini Excavator 4 hrs $350.00
    70 qty N12 ties @ $2.50ea $175.00
    These prices are retail and I am sure a regular costomer would get them cheaper.

    Would 3 hours be enough for a boom pump to pour 36.7m3
    They normally pour footings one day then thickners and slab the next.

    So would labour normally be $5826.22??

  6. #21
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    2,026

    Default

    Quote Originally Posted by col5555 View Post
    I have costed everything up and I get $12173.78 in materials only.
    45m3 @ $187.00 m3 inc gst m3 = $8415.00
    26 sheets trench mesh @ $32.67inc ea = $693.42
    17 sheets SL72 mesh @$80.08inc ea = $1361.36
    chairs 100 qty @ $38.50
    Boom pump 3 hrs $1137.50
    Mini Excavator 4 hrs $350.00
    70 qty N12 ties @ $2.50ea $175.00
    These prices are retail and I am sure a regular costomer would get them cheaper.

    Would 3 hours be enough for a boom pump to pour 36.7m3
    They normally pour footings one day then thickners and slab the next.

    So would labour normally be $5826.22??
    What about formwork, and vapor barrier ? Also levelling of site by bobcat and placing sand. Hire/wear & tear on formwork and helicopter. Maybe they're making a lot of money, maybe they're not.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  7. #22
    Join Date
    Jul 2003
    Location
    On the Downs, Darling SEQld
    Posts
    420

    Default

    I never happy unless I have a VIBRATOR.

    Settles the Concrete down nice;
    and easier to get to flow rather that TOO much Shovel work.


    $100.oo per day PLUS Transport

    up here
    Transport $80.00
    BOTH WAYS
    Navvi

  8. #23
    Join Date
    Dec 2006
    Location
    Outer East - Melbourne
    Posts
    265

    Default

    Formwork!

    If it is not right, then the whole thing is kaput.

    A friend did his own, and when the mix was poured, it collapsed.

  9. #24
    Join Date
    Dec 2007
    Location
    Newcastle
    Posts
    18

    Default

    Quote Originally Posted by col5555 View Post
    I have costed everything up and I get $12173.78 in materials only.
    45m3 @ $187.00 m3 inc gst m3 = $8415.00
    26 sheets trench mesh @ $32.67inc ea = $693.42
    17 sheets SL72 mesh @$80.08inc ea = $1361.36
    chairs 100 qty @ $38.50
    Boom pump 3 hrs $1137.50
    Mini Excavator 4 hrs $350.00
    70 qty N12 ties @ $2.50ea $175.00
    These prices are retail and I am sure a regular costomer would get them cheaper.

    Would 3 hours be enough for a boom pump to pour 36.7m3
    They normally pour footings one day then thickners and slab the next.

    So would labour normally be $5826.22??
    Pumps usually charge min 4hrs plus travel. Plus around $4-$5.00 per cubic.
    "They normally pour footings one day then thickners and slab the next"
    Thats two days so far without allowances for formwork, slab prep and ground works.
    Seems to be at least 4 days work at around $350 per man with all legals included. (w/c, super etc...). Say three men per day. $4200.00 so far. Fuel, formwork, all equipment for the right job (trowelling machine, laser level, nails, pegs etc...
    Profits are getting smaller. I reckon they are right on the money with that quote.

  10. #25
    Join Date
    Jan 2008
    Location
    Carramar in Perth's northern suburbs
    Posts
    2

    Default

    Quote Originally Posted by col5555 View Post
    Hi All,
    I recieved a quote the other day for my house pad and I was a bit shocked as my estimation was no where near what the quote come in at and I was generous in my allowances.
    What do you think the following job would be worth.

    247m2 slab area
    45m3 of concrete @$209.00 m3 = $9405.00 (over the phone price at retail) they said can do better as so much concrete
    79 metres of external footings 300x350 to be dug
    145 metres of thickinings 300x300 to be dug
    trench mesh
    N12 ties
    SL62 mesh
    WPM
    chair bars

    I have been told that this amount of concrete will require pumping and the footings/thickners will be machine dug.
    What would the reo/mesh/wpm/chair bars/ties be worth appx Ok! and average labour cost.
    Where abouts in Perth are you? I'm in Carramar and I need quotes to do a concrete pour on my limestone block extension................. also around the side of the house ............ as well as a pad leading up to a new garage. The patio needs backfilling and compacting too.

    In total it will be roughly 300m2 give or take.................. any idea cost-wise ........... and can you recommend anyone in Perth?

  11. #26
    Join Date
    Dec 2007
    Location
    Perth
    Posts
    16

    Default

    Cant recommend anyone at the moment,still sorting it all out sorry !.
    Can let you know once I have sorted it all out.

  12. #27
    Join Date
    Nov 2005
    Location
    Kilsyth
    Age
    66
    Posts
    300

    Default

    Quote Originally Posted by col5555 View Post
    I have costed everything up and I get $12173.78 in materials only.
    45m3 @ $187.00 m3 inc gst m3 = $8415.00
    26 sheets trench mesh @ $32.67inc ea = $693.42
    17 sheets SL72 mesh @$80.08inc ea = $1361.36
    chairs 100 qty @ $38.50
    Boom pump 3 hrs $1137.50
    Mini Excavator 4 hrs $350.00
    70 qty N12 ties @ $2.50ea $175.00
    These prices are retail and I am sure a regular costomer would get them cheaper.

    Would 3 hours be enough for a boom pump to pour 36.7m3
    They normally pour footings one day then thickners and slab the next.

    So would labour normally be $5826.22??
    an example, a person off the street will be charged about $170 - $180 per m3 for concrete, a high volume account customer can get the same concrete for $100 per m3, that is a $3k saving, SL72 reo, $55 a sheet etc, so the cost of materials could well be down to the $7k mark, as for formwork, it is not as if the contractors buy all new formwork for each and every job... as for labour, quite common for that to be about the same price as the cost of materials. So if the quote is $18k, they are working aon about $9k for materials, not bad for a couple of days of work for a crew of 5 or 6 (do remember though, house slabs are a big job to do right, not a job for the home handyman to tackle, thats for sure)

  13. #28
    Join Date
    Feb 2008
    Location
    Aust
    Posts
    192

    Default

    I have been told that this amount of concrete will require pumping and the footings/thickners will be machine dug.
    Theres ya Doh

    Concrete pump, Mini excavator

  14. #29
    Join Date
    Nov 2005
    Location
    Kilsyth
    Age
    66
    Posts
    300

    Default

    Quote Originally Posted by autogenous View Post
    Theres ya Doh
    Concrete pump, Mini excavator
    Concrete pump - slab of Jim Bean & Cola + $100
    Mini excavator - slab of Jim Bean & Cola + bottle of chivas regal

    of course, it helps to get these rates if they are mates

  15. #30
    Join Date
    Dec 2007
    Location
    Newcastle
    Posts
    18

    Default

    Quote Originally Posted by Terrian View Post
    Concrete pump - slab of Jim Jean & Cola + $100
    Mini excavator - slab of Jim Bean & Cola + bottle of chivas regal

    of course, it helps to get these rates if they are mates

    Can I be his mate as well. I promise to laugh at all his jokes.

Similar Threads

  1. Estimate cost of garage slab please?
    By juliussee in forum CONCRETING
    Replies: 21
    Last Post: 17th March 2008, 06:35 PM
  2. Cost of suspended patio slab
    By frog_hopper in forum CONCRETING
    Replies: 16
    Last Post: 4th November 2007, 12:00 PM
  3. New house -Chimney cost
    By jayem in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etc
    Replies: 11
    Last Post: 13th July 2007, 08:37 PM
  4. concrete slab cost sydney
    By bianca3920 in forum CONCRETING
    Replies: 2
    Last Post: 8th October 2006, 08:31 AM
  5. Average Cost of Home Foundations/Slab
    By lavishhouse in forum CONCRETING
    Replies: 5
    Last Post: 3rd June 2006, 10:48 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •