Thanks Thanks:  0
Likes Likes:  1
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Page 2 of 2 FirstFirst 12
Results 16 to 24 of 24
  1. #16
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    62
    Posts
    4,374

    Default

    John,
    worked about ten months on a large commercial project for a plasterboard company. (For some unfathomable reason they also picked up a few joinery contracts). In the heat up here both basecoat and cornice cement go off pretty quickly. Some of the plasterers used to add citric acid or even lemon juice as a retarder. It wasn't by the book, but then I don't think the book was written with high 30s/low 40s temperatures in mind.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  2. #17
    Join Date
    Jul 2006
    Location
    Melbourne
    Posts
    706

    Default

    Interesting subject.

    All plaster has some retarder in it, (as well as a lot of other stuff).

    Citric acid is a good retarder as it won't stain, like milk which is also a retarder. Lemon juice also works well.

    When using a retarder you need to be carefull that the plaster is actually setting an not drying. It is not a good idea to use retader in hot weather. If the plaster dries before it sets then it is weakened, sometimes to the point that cornice will fall off the wall.

    I have seen this happen on quite a few occasions. When retarding base coat the problems are not so apparent. Cracking can definitly occur if retarder is used in the wrong conditions.

    In a way during hot weather it would be better using smaller mixes and use an accellerator like salt. to ensure setting as opposed to drying.

    Having said that I doubt that a contractor would ever do it. They really can't afford to slow it down. But it would be better.

    Personally I never use retarder on decorative cornice, mainly because the cornice sucks the moisture out of the plaster, creating more chance of the mix drying rather than setting.

    When trowlling in hot weather we use a drying compond (all purpose mix), this solves the problem, no need to retard all purpose compounds.

    Cheers.

    PS great work pawn.
    Great plastering tips at
    www.how2plaster.com

  3. #18
    Join Date
    Feb 2007
    Location
    Brooklyn, NY
    Posts
    1

    Default celing fan help

    The bristles on the brush have to lay flat. Perhaps you need to wet it thoroughly and leave it overnight on a piece of plywood with the bristles splayed out.



    Home renovations are easier than you think.

  4. #19
    Join Date
    Oct 2006
    Location
    perth
    Posts
    222

    Default

    Hi all

    An update - I haven't done the ceiling hole yet - I did pick up an off cut from a building site tho - next week.

    The Kitchen - I got some gyprock final finish and some cornice cement.
    I opened the final finish to have a look - it is all creamy and caramel coloured made me hungry

    I gave it a go 1st and yippee its great, I applied one thin cost flush will the good bits of the wall and filling the holes, it goes on really easy.
    Today I gave it a light sand and a second light coat and it came up a treat. One more light sand and it ready for painting.

    Some photos - note it's the creamy coloured area - the bits you will see above and around the cupboards, also the area on the right on the big wall still needs a second coat.

    celeste

  5. #20
    Join Date
    Jul 2006
    Location
    Melbourne
    Posts
    706

    Default

    Well done.
    Great plastering tips at
    www.how2plaster.com

  6. #21
    Join Date
    Oct 2006
    Location
    perth
    Posts
    222

    Default

    Hi all

    Well I finished the wall plaster and added some paint today - looking good.

    Not so lucky with the ceiling fan hole, the patch piece dropped a little to late all set so I am using cornice cement etc and trying to make it less noticable (is this spelt right - looks funny). I did the final coat today and will sand it and see tomorrow - Hopefully the kitchen will look so good no one will notice

    I will post some photos in the next couple of days

    Celeste

  7. #22
    Join Date
    Jul 2006
    Location
    Melbourne
    Posts
    706

    Default

    Celeste if you used the cleats and screwed the patch to them it should not have droped at at all.

    For anyone else reading this, you can slip a thin packer between the cleat and the ceiling sheet. That will recess the patch the thickness of the packer used.

    Celeste you can use a scraper to scape back the bump almost until you get to the tape then fill out away from the bump (top coat will do) quite wide, to reduce the effect.

    Good luck with it.

    Cheers
    Great plastering tips at
    www.how2plaster.com

  8. #23
    Join Date
    Oct 2006
    Location
    perth
    Posts
    222

    Default

    [quote=rod@plasterbrok;512416]Celeste if you used the cleats and screwed the patch to them it should not have droped at at all.

    No, I didn't I got lazy and used a couple of pieces of plaster and liquid nails........ naughty me.

    For anyone else reading this, you can slip a thin packer between the cleat and the ceiling sheet. That will recess the patch the thickness of the packer used.

    I will recess it a little on the next one - easy to fill than scrape back.


    Celeste you can use a scraper to scape back the bump almost until you get to the tape then fill out away from the bump (top coat will do) quite wide, to reduce the effect quote]

    Exactly what I have done - did not get to sanding it today, had the little one with me, she woke up with a bit of a temp. So she watched mummy paint and build cabinets from the comfort of her bean bag. Only clean place for her was the Kitchen so I could not make big clouds of plaster dust. Tomorrow.

    I will have all the base cabinets installed, the walls all painted and the ceiling finished tomorrow, so I will take some photo's and post them.

    Celeste

  9. #24
    Join Date
    Oct 2006
    Location
    perth
    Posts
    222

    Default

    Hi all

    Well I have finished the walls in the kitchen and installed most of the cabinets - 3 overheads to go, IKEA gave me the wrong one and it goes in the corner so the other 2 will have to wait until I switch them.!!

    any way heres some pictures 2 B4 and 3 after


    Thanks for your help guys, I am pretty pleased with the walls - don't look at the ceiling, still need to sand and paint. I got a bit frustrated with it and have decided to leave it until I get back from my break in lovely warm Broome all refreshed.

    Oh and there are a couple of my 1st attempt at limestone garden edge /wall.

    Celeste

Similar Threads

  1. skimming a ceiling HELP!!
    By ltfc1988 in forum PAINTING, PLASTERING, TILING, DECORATING, etc.
    Replies: 2
    Last Post: 2nd November 2006, 12:49 AM
  2. Hole in ceiling gyprock
    By Farm boy in forum PLASTERING
    Replies: 3
    Last Post: 2nd September 2006, 01:23 AM
  3. cracks in plasterboard ceiling
    By jasdillon in forum PLASTERING
    Replies: 0
    Last Post: 19th July 2005, 09:21 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •