Simple question...my electrician is coming in tomorrow afternoon to do some free work for me in my shed (I have known him for a while). As he is coming after work and I don't want to waste too much of his spare time, I said I will fix the line of mounting blocks and conduits onto the wall so it will be ready for him to run the cable and connect the power points.

Should I cut out/drill holes the same diameter as the conduit in the sides of the mounting blocks to allow the conduit to fit into the mounting block OR can I just cut out a smaller hole in the mounting block to give enough room for the cable and just butt the conduit up against the block.

Thanks in advance


Read the full thread at RenovateForum.com...