Hi guys

ive got a plumb 2.4 high wall height with timber beams and infills above that

2 sheets @1.2 high is exact.

Question - How do i finish the very top groove bit if im not using cornice? The groove bit thats meant to be taped and plastered...
Do i have to plaster this to a flush finish? which will be impossible messy job as the timber infills and beams are right there..

Any other way or am i stuck with leaving it as an imperfection?

thanks


Read the full thread at RenovateForum.com...