Results 1 to 1 of 1
-
16th November 2008, 07:18 AM #1
Bathroom Reno - Shower Windows, slabs & wall preparation
Hi All, We have decided to undertake our first bathroom reno! We have entirely ripped out the original bathroom and have a few questions about the next steps to take. 1. We want to place the shower in the end of the bathroom where the window is. The problem is that the window has a wooden frame and will cause serious problems if it is in the shower and will continually get wet. Question is: If we replace the window frame for an aluminium frame, would this be ok to have in a wet area?...
More...
Similar Threads
-
bathroom reno
By cabman in forum BATHROOM & TOILETReplies: 13Last Post: 10th February 2008, 08:48 AM -
Joint Preparation for Blueboard wall
By pfuller in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etcReplies: 10Last Post: 24th January 2008, 05:36 PM -
Bathroom Tiling Preparation
By AndyChiz in forum BATHROOM & TOILETReplies: 2Last Post: 18th March 2007, 01:45 PM -
Bathroom renovation - pre-tiling preparation advice please
By Arron in forum BATHROOM & TOILETReplies: 5Last Post: 13th May 2005, 08:14 PM -
Re-grouting of bathroom/shower wall tiles
By Mike_R in forum BATHROOM & TOILETReplies: 6Last Post: 10th January 2004, 09:23 PM
Bookmarks