ive got this IP hole or what ever its called with15 cm top inside diameter, outside the dunny room. it is buried about 5cm. i need to pav over the top of it where i will be building the area up another 15cm. i dont want to block this hole off, is there a way i can extend it so it sits level with my paving when finished incase its ever needed??

Attached Thumbnails



More...