Results 1 to 6 of 6
  1. #1
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    86

    Default 1 or 2 lifts on double hung window

    All of the other windows in our Queenslander are casements, but we are putting a set of double hung windows in the kitchen because it opens onto a servery (and bi-folds were too expensive) - see attached. My question is whether I should put 1 or 2 lifts (the J-shaped fittings you use to lift the window) on each window? What do most other double hung windows have? Or is there no standard way of doing it?

  2. #2
    Join Date
    Oct 2003
    Location
    Kentucky NSW near Tamworth, Australia
    Age
    86
    Posts
    1,067

    Default

    Theremin

    I would put them on both sashes as at times you may want to open the top of the windows to let a bit of hot air out in the summer.

  3. #3
    Join Date
    Apr 2003
    Location
    Adelaide, SA
    Age
    88
    Posts
    36

    Default

    Theramin - I think you meant how many on EACH sash? The answer is always 2 on the bottom sash. After painting or during wet weather you may need both hands to lift the sash. If the windows go very low (below hip height) you may not put any on as most people will lift the bottom sash by lifting the meeting rail.
    On the top sash I have found it is convenient to put lifts (up side down) on the top rail as it does make it easier to pull the sash down. Otherwise you can only start the sash down with your fingers pushing the meeting rail down - not easy. However these will have to be removed when painting as they stop the sashes passing.
    Hope that helps
    Cheers
    GeoffS

  4. #4
    Join Date
    Oct 2002
    Location
    Tin Can Bay, Queensland, Australia
    Age
    73
    Posts
    64

    Default

    Theremin

    GeoffS hit it on the head - Two handles - 1 at either end of the sash is normally the way to go. I've never seen handles put on the top sash because as he points out you can not open the window fully. Also as long as your counter balances are working properly you souldnt nedd a lot of force to get them going in any direction.
    These windows going to be subjected to a lot of weather? If so make sure you keep the maintenance up.

    Jamie
    Perhaps it is better to be irresponsible and right, than to be responsible and wrong.
    Winston Churchill

  5. #5
    Join Date
    Apr 2003
    Location
    Adelaide, SA
    Age
    88
    Posts
    36

    Default

    Barnsey - Fine if you have balance weights but the those wretched spiral balance things are not so great, particularly when they get a bit old and worn. Also if the top sash sticks shut (paint, wet weather etc.) there is really nothing to push it down with, apart from your finger tips or a stick pushing on the meeting rail.
    I have found lifts on the top sash very convenient and they don't stop you fully opening the window, they just stop the sashes passing which they need to do when you are painting.
    Steel double hung sashes actually do come with them in the extrusion. I have also seen finger grips cut into the top rail of the top sash.
    Cheers
    GeoffS

  6. #6
    Join Date
    Aug 2004
    Location
    Brisbane
    Posts
    86

    Default

    Geoff & barnsey - Thanks, that's what I meant (how many lifts on each sash) and I agree 2 on each bottom sash is the way to go. The windows are part way through being finished with Integrain Dimension 4 and DWD, but I'll use an enamel where the windows contact. They are easy to move at the moment but I imagine over time with some dust or lack of use (during winter) they might get stiff. I think one lifter on the top sash is probably a good idea as well and I'll just take it off when re-painting. They open out onto a covered deck so will not get much weather.

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •