Results 1 to 3 of 3
Thread: Quick set cement/concrete
-
5th April 2008, 05:25 PM #1Intermediate Member
- Join Date
- Apr 2006
- Location
- Sydney
- Posts
- 21
Quick set cement/concrete
I am putting in some posts for a retaining wall and I have the quickset stuff ready to put in the holes tomorrow.
The instructions say to mix it with water in a wheel barrow etc.
What do you do? Put it straight in the hole then add water or follow the instructions?
-
5th April 2008, 05:39 PM #2
I have done it both ways. If using a barrow make it a little more runny than normal, this stuff really does go off quickly.
If pouring into the hole dry, dont put it all in at once. Put maybe 1/3 of the bag in, add water and mix with a stick or whatever is handy, add 1/3 more powder then water and mix etc until done.
Hope this helps Cheers StevenThe hurrier I go, the behinder I get.
-
5th April 2008, 06:10 PM #3
Add water to hole, poor rapid set in. My understanding is that the water ratio is not important with rapid quick set because its a faster chemical reaction than normal. Never had a prob with this method.
Rapid Set says not to do it in a barrow.
Similar Threads
-
How much cement
By cart in forum CONCRETINGReplies: 6Last Post: 1st March 2008, 07:10 AM -
Setting posts in cement vs concrete
By schwartzy in forum LANDSCAPING, GARDENING, OUTDOORSReplies: 12Last Post: 23rd January 2008, 12:57 PM -
New deck - Area currently concrete tiles over sand base on top of concrete slab.
By Dr - 307 in forum DECKINGReplies: 25Last Post: 21st November 2007, 03:23 PM -
Cement Mixers
By Grunt in forum CONCRETINGReplies: 21Last Post: 3rd June 2007, 11:46 PM
Bookmarks