6th July 2007, 12:23 PM #16Often confused!
- Join Date
- Jul 2006
- Location
- Brunswick
- Posts
- 126
Quotes to do the bathroom ranged from $40K (putting villaboard on the window wall) to $55k doing it all in solid brick and plastering the bathroom anew.
We are getting a new room nearly 6000 x 6000, a chimney removed, a concrete wall removed, double glazing, new toilet, sink, tiling in bathroom a second shower, moving existing toilet and a new HWS for around that amount!!! Must be like weddings, add the word bathroom and triple your normal price!
Cheers
Mcblurter
-
6th July 2007, 12:26 PM #17Often confused!
- Join Date
- Jul 2006
- Location
- Brunswick
- Posts
- 126
Oh, also getting 3 manual openable skylights with electric blockout blinds, two whirleygigs and a suntunnel for around the $8000 mark. Will let you know the progress.
Cheers
McBlurter
-
7th July 2007, 07:19 PM #18Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
window Sanded
Well 2 hours work sanding the window and she looks almost usable. Cost for stripper and sandpaper was $27. Needs a coat of clear interior exterior finish($25), 2 brass handles ($12 ea), 2 brass opener slides($19.50 ea) and 2 leadlight panels for which I have been quoted $220 each and she should look ok.
Total cost of window approx $550
Waiting for a builder acquaintance to come and put a steel lintel in for me and saw the opening.
I will now check out the footing for the wall I have to brick up so that I am ready to start bricklaying after the window is in.
Cheers
Juan
Attachment 50135
-
12th July 2007, 08:58 PM #19Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Window Going In
Today was cut a hole for window day.
Took 5 hours to cut it and stuff around with 2 lintel bars.
Tomorrow I will finish off the lintels and trim up the stonework ready to plaster around the window to tidy her up.
Attachment 50467
Attachment 50468
Attachment 50469
Attachment 50470
Once the plaster and concrete around the lintels is cured I will start bricking up the large wall opening in the foreground of the bottom photo and removing the bathroom end wall.
Old bathroom still going strong.
Cheers
Juan
-
16th July 2007, 07:17 PM #20Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Tiling the shower
Trying to think ahead re the tiling task.
As you can see in the proposed plan, I will have the shower in a corner. The brick walls will end up re-plastered as the existing plaster is not flash. Since I proposed tiling to 2m all round, I will ask plasterer to only skim coat above 1.90m.
My question relates to the tiling of the shower / wet area. I assume I need to waterproof the whole shower wall and floor area as well as around the bath and around the bottom of the walls to 300mm. Do I need to waterproof the screed on the whole bathroom floor?
Will I need to tape the wall to wall and wall to floor joins of the shower area?
What are the best brand products for the waterproofing?
Cheers
Juan
Attachment 50837
-
4th August 2007, 07:16 PM #21Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Renovation
Well my timetable to renovate the bathroom is slipping behind. Hurry up and wait is the name of the game. Wait on the plumber and the weather.
Attachment 52270
Have seriously underestimated the time to make good after the new sewer, gas and water main are installed. I allowed a week but reckon 2 weeks is more likely.
Attachment 52271
I have started bricking up the wall. As you can see I am no brickie but it will be all hidden and plastered so that is fine. Soon I will start demolition of the dividing brick wall. First an access hole in the dividing wall, then complete bricking the other wall. Need to keep the old bathroom going as long as possible to limit disruption.Juan
"If the enemy is in range, so are you."
-
4th August 2007, 07:26 PM #22Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Ceiling
Once the dividing wall is gone I will look at putting in a new ceiling with Villaboard at a new lower height of 3.0m rather than the 3.4m. That will be same height as the new extension we are planning which will be at 3.0m.
Q? What is the best way of suspending the new ceiling below the existing lath and plaster one . I had thought of fixing a 100mm x 40mm pine frame around the wall then new joists attached to that frame and suspending them from the existing joists above with pine battens.
Does this sound OK???Juan
"If the enemy is in range, so are you."
-
15th August 2007, 08:09 PM #23
Sounds OK to me Juan!
If you run your 100 x 40 pine ceiling joists across the narrow dimension of your room you wont have to fix them to your existing joists. Fix the joists with joist hangers to the pine running around the walls, making sure that the pine framing around the wall is securely fixed into the masonry walling.
doog
-
16th August 2007, 07:30 PM #24Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Ceiling
Thanks for that. Not sure what joist hangers are but will look around. I had thought it might be a good idea to support the new joists from the joists above but like your idea better as it will reduce the likelihood of any movement in the new ceiling when I tramp around the roofspace.
CheersJuan
"If the enemy is in range, so are you."
-
18th August 2007, 01:08 PM #25Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Renovation
Well the sewer trenches have been filled and the mess somewhat remedied. I am now back at the bathroom. Have almost finished bricking up the outer skin of the cavity wall opening.
Attachment 53411
Had to cut an access hole to the extension area. Bathroom still going strong.
Attachment 53410
Hope to have the inside wall bricked up to the lintel by end of next week. Big task then is to remove the 300mm square timber lintel and brick it up solid.
Cheers
JuanJuan
"If the enemy is in range, so are you."
-
23rd August 2007, 08:56 PM #26Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Renovation
Well a few more bricks have been laid so here is the latest photos.
Finished bricking up to the timber lintel on the laundry side. No need to worry what it looks like as it will eventually be covered with villaboard or the like when we redo the laundry.
Attachment 53787
Started pulling down the wall to get some bricks to brick up the bathroom side of the cavity wall.
Attachment 53788
When I have the lintel supported by the two walls of bricks I will hit it with a chain saw and remove it. I will do it in about 3 bites rebricking where the lintel was. It was suggested I should leave the old timber lintel there and plaster over it but I think I would end up with cracks so I will take the sucker out.
Attachment 53789
Attachment 53790Juan
"If the enemy is in range, so are you."
-
24th August 2007, 08:46 AM #27Owner Builder
- Join Date
- May 2007
- Location
- Altona Vic
- Posts
- 66
Hi Juan, I've been following your reno story with great interest for some time now, thanks for posting the regular updates.
I just have a quick question; when you're building a cavity brick wall, do you use some kind of brick-tie that spans the cavity?
Also, is it common practice to build one side of the wall first, and then the other side? Or is it more usual to build both sides simultaneously?
Thanks,
Zac
-
24th August 2007, 12:01 PM #28Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Cavity Brick Walls
Hi Zac, I am not a brickie so will leave it to the experts to advise. The opening is only about 1.8m in width but I did put wire ties in the outer skin to attach to the inner as it rises. I also used a couple of reinforcing wires in the courses for form sake. I have taken care to dovetail into the existing courses where it meets the old walls.
I see no reason to not brick them up separately. For me it was a case of get one wall up asap so my daughter would not get shower fright from all the percieved pervs lurking in the laundry.
I should have the inner wall up to the lintel by the end of the weekend. I will let it set a bit before hitting the lintel with the saw. There is only 6 courses of bricks on top of the lintel so if she goes wobbly on me I will just rebrick them - one side will be plastered and the other not really visible unless you get on the roof with a ladder.
CheersJuan
"If the enemy is in range, so are you."
-
29th August 2007, 08:47 PM #29Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Renovation
I have started to remove the 2.0 metre long 300mm x 300mm timber lintel.
Started at the old bathroom end wall end of the lintel.
Attachment 54261
Attachment 54262
Took out a couple of bricks above the lintel and hit it with the little talon chain saw. Made short work of it. Time consuming bricking up to the brick courses as I do not have scaffold and am working on steps and a ladder.
Attachment 54260
I cut a bit of the cement sheet off the laundry ceiling so I could see what is going on. Laundry is due to be demolished in the coming months.
At this rate it will take 5 days to remove the lintel and rebrick. Then I can start demolishing the old wall and stripping off the old plaster.Juan
"If the enemy is in range, so are you."
-
30th August 2007, 05:00 PM #30Senior Member
- Join Date
- Jun 2007
- Location
- Adelaide
- Posts
- 274
Bathroom Renovation
Today I attacked the other end of the lintel and removed a chunk from the stone wall. I will brick the hole up tomorrow and then let it set before I take 2 more bites to finish it off.
Attachment 54371
See the OZITO RHG-550K Rotary Hammer Drill. This little sucker costs $68 at Bunnings and is my favourite toy. I have only use it in destruction mode to date breaking bricks, plaster and weak concrete. It is an amazing tool. Came with a 3 year warranty but if I had to bin it at the end of the bathroom renovation I would still say it is amazing.Juan
"If the enemy is in range, so are you."
Similar Threads
-
paint for bathroom renovation
By EMistral in forum BATHROOM & TOILETReplies: 9Last Post: 16th April 2007, 01:27 PM -
Small bathroom renovation almost complete
By sco in forum BATHROOM & TOILETReplies: 5Last Post: 7th April 2007, 10:18 PM -
First time bathroom renovation
By chrisnstell in forum KITCHENS, BATHROOMS, THEATRES, etcReplies: 10Last Post: 8th November 2006, 03:08 PM -
Bathroom Renovation / Creation
By RedRock in forum BATHROOM & TOILETReplies: 4Last Post: 7th July 2003, 10:22 AM
Bookmarks