Results 31 to 45 of 62
Thread: Driveway surface
-
12th July 2007, 10:54 AM #31If you decide to go that route though, get a quote for the bigger loads, mini skip is the dearest way to buy it and the difference in price is quite significant."I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
12th July 2007, 11:07 AM #32
-
12th July 2007, 12:06 PM #33
Hi Silent,
I think using reo is a waste of time and money.
That is unless you are going to use dowels between each panel. Using dowels is a pain and if not set correctly will cause the concrete to crack anyway.
My two Bobs worth in order of economics
1.Gravel over crushed stone is good when done well but requires drainage to be addressed and some ongoing maintenance.
2.Sprayseal over crushed stone is exactly the same except the sprayseal will disapear quite quickly.
3.Asphalt is exactly the same but less maintenance (its will still crack and to do it well the subgrade and subbase preparation costs starts to make concrete more viable.
4.Concrete even on a minimal prepared base will last quite a long time and any cracking from lack of steel can be lived with unless you are close to trees.. even then roots will stuff it up.
5. Segmented paving bordered by white post and rail fences and a few horses running around in the manicured padocks if you really want to impress the neigbours.
-
12th July 2007, 12:17 PM #34
Asphalt is pretty much out of the equation because based on the quotes I got (which are inclusive of prep work), for 14k asphalt I might as well spend a bit more on concrete.
Reo - well, yeah I suppose. It doesn't add that much to the cost though and I've got a couple of panels left over from the house slab. I didn't put any in the driveway up in Sydney.
Cracking - not really bothered about that because even if it does crack, it will still be sound to drive over and it wont wash away.
The neighbours across the road put down road base and the first time it rained they had a 1 foot wash out across it that made it impassable. She was parking out the front for weeks until they got it fixed.
Haven't got a quote on paving. I did a paving job of a similar size up in Sydney once. Big job but looks good. Hmm white fences you say? Will I need a fountain in the middle too?
My first thought was to use gravel. Drainage is an issue but a few sump drains here and there would take care of it. I suppose that would be the look I'd like most but not great for the kids on their skateboards.
Decisions, decisions..."I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
12th July 2007, 12:45 PM #35
Silent, sounds like you have made up your mind and leaning strongly in favour of concrete and I think it is the best taking it all round but are you seriously going to tackle it yourself? Must admit I wouldn't be game myself, but then again, maybe 20 years ago.
If I could afford it and had a drive that long to do. I would go the reinforced concrete.
Would be interesting to see a pic of the drive when its completed.Reality is no background music.
Cheers John
-
12th July 2007, 12:57 PM #36
Not sure I've made up my mind but I would prefer concrete from the maintenance point of view.
Whether to do it myself or not - well, I'm not that concerned about it from the ability point of view, it's just the thought of all the work that gives me second thoughts. It certainly is nice to watch someone else doing the hard yakka. Paying someone to do the lot would chew up the budget that I've set aside for everything that needs to be done. It's a matter of what can be done with the resources on hand."I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
12th July 2007, 02:06 PM #37
All great journeys start with the first step.
Take another leaf out of the book of concretors and do the pours first thing in the morning - if your all prepped so the concrete arrives before 7am you'll be finished it by somewhere near 10am for your first few then nearer 9am as you get better.
Ideally one person on the screed and two just making sure the mix is pretty level against leading face of the screed - one can do it but it's a lot easier with one each side of the screed guy - even kids can do this bit - it's fun for them.
Don't forget what I told you - smaller aggregate is a lot easier to push about and use plastic membrane makes it slide nicely too.
If your mini mix guy is decent he will move the feed along nicely with the pour and the amount you have to push about will be minimal.
For me I never bothered worrying over it a lot with a timber trowel - just worked back across it a few times with the screed from the side and then once it's set enough - light finish with a broom.
If I weren't so far away I would have helped you with the first three to get you going.
The plastic and the reo will also help avoid early plastic shrinkage cracking as the concrete sets - once the concrete has set and you have broom finished it you will do the concrete a favour if you decide to lay a weighted down sheet of plastic over the panel - the more moisture you retain the better the concrete will cure.
Biggest risk to big concrete pours we get involved in (up to 50 x 50m pours) is early plastic shrinkage cracking and it is at highest risk on windy days when the breeze dries out the concrete. If the concrete is allowed to set and has no cracks then the concrete itself develops a tensile strength capacity - if there is a crack then tensile capacity of concrete is zero (except what reo adds to the section) - so an uncracked slab is less likely to develop cracks in the future - many slabs have micro-cracks and under stress later in life (be it from load, sortening etc) will develop visible cracking.Cheers
TEEJAY
There is a very fine line between "hobby" and "mental illness"
(Man was born to hunt and kill)
-
12th July 2007, 02:27 PM #38
You make it sound like it has to be done in a weekend - a mere 2 panels a weekend would have it done in two months - 2 to 3 hours each morning and some prep work during the week (another hour max).
When I did my driveway I did a panel a night 3m x 3m over two and a half weeks - took 2 hours a panel - forming, mixing, pouring screeding and cleaning up - it's gotta be a lot easier when someone mixes it for you and puts it at your feet - no barrowing, no heaving up into a mixer.
100m or 500m - what does it matter if you pace yourself and not kill yourself. Just be smart in your approach start with lower expectations and build up - you'll probably get fitter - not cactus.Cheers
TEEJAY
There is a very fine line between "hobby" and "mental illness"
(Man was born to hunt and kill)
-
12th July 2007, 02:31 PM #39Senior Member
- Join Date
- Jun 2007
- Location
- In a House
- Posts
- 256
Teejay you sound like the "man" when it comes to pouring concrete now I have a question I hope you can help me with, I poured a slab 18 mtrs long by about 3 mtrs wide about 70 mm thick it runs parrallel with the front of my house) poured it in one hit! as I had to hire a concrete pump ( a very steep block) and did not want to hire it a second time the slab is up against a retaining wall on one side that runs the full width of the house,and the other is up against the house with an everhard plastic drain between that also runs the full length of the house,"I hope you get the picture" now I only put an expansion strip ( on a roll)across the front of the house (18 mtrs) hard up against the brickwork when I was pouring but I did not put any across ways as the drain was in the way then I would have to cut 2 strips one either side of the drain is it possible and I think I have seen it done using a concrete saw and cut the concrete in sections to aleviate any stress? If so do you cut the full thickness of the slab? or just half way? Any suggestions?
-
12th July 2007, 02:49 PM #40
Yes Patty that is pretty straight forward to accept shortening of the slab the slab is cut (not full depth) and then as the slab shortens it develops a crack in the remaining bit of concrete - this is fine for slab shortening BUT it will not account for slab expansion. Slabs expand from thermal effects and to account for this you need a gap FULL DEPTH of the slab. If your area gets those 30-35 deg days and as you drive along a road have a look at all the long thin concrete panels in traffic islands how they have expanded such that they push against each other and lift up at the joints.
To make an expansion joint work it must be a gap - that is either you put compressible material in place before placing the concrete like ableflex OR you make the cut full depth then seal the top face with silicon type sealant to allow the gap to close and also to stop the gap filling with dirt and crap that will prevent the gap closing.
Your saw will only cut a gap a few millimetres wide - so you have two choices - make more cuts or make this cut wider and clean out the rubble - easier to do a few cuts - but your choice.Cheers
TEEJAY
There is a very fine line between "hobby" and "mental illness"
(Man was born to hunt and kill)
-
12th July 2007, 02:56 PM #41Senior Member
- Join Date
- Nov 2005
- Location
- Kilsyth
- Age
- 66
- Posts
- 300
-
12th July 2007, 03:07 PM #42Senior Member
- Join Date
- Nov 2005
- Location
- Kilsyth
- Age
- 66
- Posts
- 300
fine *if* the concrete truck can drive around this area for the next weekend of concreting
(don't want 10tonne of concrete truck driving over your still green concrete) (assume mini mix with about 2.2m3 on board)
Get edge formwork such that it is long enough to fit the mesh without the mesh needing trimming - eg if mesh 6m long then edgeboard 6.1m long minimum. Use 90 x 60mm laminated formwork edgeboards as they are rigid and will need minimal fixing and will hold shape and not bulge
worst thing about concrete, working the surface too much, leads to powdery surface, only decent fix is to seal.
-
12th July 2007, 03:09 PM #43Senior Member
- Join Date
- Nov 2005
- Location
- Kilsyth
- Age
- 66
- Posts
- 300
-
12th July 2007, 03:16 PM #44fine *if* the concrete truck can drive around this area for the next weekend of concreting
(don't want 10tonne of concrete truck driving over your still green concrete) (assume mini mix with about 2.2m3 on board)
25 is what they quoted me on."I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
12th July 2007, 03:19 PM #45Senior Member
- Join Date
- Nov 2005
- Location
- Kilsyth
- Age
- 66
- Posts
- 300
you could just pour 2 strips of concrete, get a load of pebbles from the Bairnsdale quary to between the strips, would look pretty good.
Make the strips about 1.2m wide, 600mm gap between them, that would give you a 3m wide drive, a whole lot easier screeding off 1.2m wide compared to 3m wide
The pebbels from the above quary are a light brownish colour
Similar Threads
-
HOW TO OBTAIN AN EVEN, "mirror like" SURFACE ON PAINTED MDF
By yorkincr in forum FINISHINGReplies: 23Last Post: 17th December 2007, 12:49 PM -
What to do with/to this driveway?
By Tok in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etcReplies: 4Last Post: 18th September 2006, 09:35 AM -
concrete truck on driveway
By jeremy in forum CONCRETINGReplies: 8Last Post: 30th July 2006, 04:09 PM -
Rural driveway
By mrsxtro in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etcReplies: 19Last Post: 22nd June 2006, 09:21 PM
Bookmarks