I am about to lay some T-G spotted gum floor in the kids playroom. (Thanks studley )
I have never done it before so I need your advice. Anything you know will help.
What kind of nail to use? Do I drill a pilot hole first? Can I do secret nail with my T-G floor boards? How big does 1 m3 floorboards cover? Sanding? Finishing? ……
Thanks in advance.Visit my website at www.myFineWoodWork.com
-
9th July 2007, 04:35 PM #2
I laid some recycled brushbox flooring a while back mating up to 'professionally' laid new brushbox flooring. The floorers used air nail guns and weren't took concerned about splits, they just filled them with spackle and red stain before finishing. uggh
My old boards may have been dryer and I hand nailed but I found I had to pre drill. I also used longer nails. When it came to finishing, punching down the nail heads went quite slowly until I started using the 3lb hammer, the nail punches I had all mushroomed at both ends eventually, I ended up grinding both the point and head occasionally to get the punches back into usable order.
I tossed up whether or not to buy flooring cramps, in the end I just screwed down a board and used sliding timber wedges to tighten up each set of boards before nailing.
The hardest thing was to sort the floor boards and select the best ones to cut and where. You don't want to end up with a room that has all long boards at one end and all shorts at the other.
Not having a compound mitre saw I just made up a jig out of a bit of softwood sleeper and other offcuts that let me cross cut the boards simply with my old Skil saw.
After all the hard work, I had a great deal of ongoing satisfaction seeing that floor every day until we sold that house! However each time I looked at the filled 'professional' job I got the creeps!
Have fun, wear gloves and safety glasses. Hold the punch monkey grip style, (fingers and thumb wrapped in the same direction), it might save a few mashed knuckles.
-
9th July 2007, 06:19 PM #3
Wongo.
Go to www.timber.org.au and download the flooring installation data sheets and all will be revealed.
Hire a secret nailer and the nails.
What is the floor going to be nailed to?
Give us a Cooee.Hooroo.
Regards, Trevor
Grafton
-
10th July 2007, 11:43 AM #4
-
10th July 2007, 12:29 PM #5
How wide are the boards?
Assuming they normal 4 inch ones then:
I just laid about 90sqm of the Studleys stuff in our extension (see thread photos etc) and these are my tips:
It comes up a treat.
Hire a secret nailer and hammer from a hire shop. (you need a compressor as well)
Buy the brads from a hardware store.
Assuming your skirting boards will go over the top, then that gives you some room to move with the first line of boards, but try and get them perpindicular to the opposite end of the room (dont assume a square room - especially if you built it yourself ) and check it as you go
When cutting the boards to length dont cut the end matched bit, and always make sure your cutoff saw is cutting square.
Use whatever form of leverage you can to press the boards together as you go. I used a crowbar into the ground under the floor and got heaps of leverage.
Dont fret about the gaps, I had some around 1 or 2mm and was a it worried about it, but it came up fine once it was sanded.
Bang the crap out of the nailer when running the boards in.
Consider using liquid nails as well, I rang some across the joists prior to laying each boards - just for piece of mind.
You will probably need a bradder to finish off the last few lines of boards.
Consider getting them professionally finished, we did and it was definitely worth it, cost $27 per sqm but much better job than I could have done.
CheersThere was a young boy called Wyatt
Who was awfully quiet
And then one day
He faded away
Because he overused White
Floorsanding in Canberra and Albury.....
-
11th July 2007, 06:00 AM #6Senior Member
- Join Date
- May 2007
- Location
- Darwin NT
- Posts
- 81
Wongo,
Fuzzie has got it right as far as I'm concerned.
I almost never did secret nailing, and NEVER used a nail gun.
I never once tried sanding and sealing myself. I always got a pro to do the job.
I have my take on laying timber floors here.
http://www.builderbill-diy-help.com/trim-carpentry.html
Here's part of what I say.
- Make absolutely sure that the boards are dry, test before you lay. They might have been kiln dried etc, but that was then, what about now? (I am talking about natural timber here, not man made floating floors).
- Check your floor joists and straighten as needed. You won't get another chance.
- If you have the slightest doubt that the floor joists are a bit light on, a bit springy, never mind what anybody else says, stiffen the whole floor up with a couple of rows of bridging or noggins or herringbone bracing.
- I've got a bad back and arthritis in my knees, but you will never convince me to lay a quality floor with a nail gun. An old floor sander and finisher once told me that he could often feel the boards moving under his large machine, when they had been fixed with "T" nails.
- Cramp it and cramp it tight then fix it solid.
Bill
-
11th July 2007, 07:45 AM #7Senior Member
- Join Date
- Aug 2005
- Location
- brisbane . australia
- Posts
- 0
You never stated how wide the boards are. Im pretty sure you cant secret nail anything over 80mm. if thats the case just pump 2 45mm t-nails into each board. Get 3 floor cramps and cramp every second joist using a scrap piece of flooring so as not to damage the floor.
You should be able to lay about 10 rows before having to nail off.. just make sure when you do cramp the boards dont jump out.. Use a level or piece of flooring across the boards and stand on it while you cramp.. You `ll need the level anyway to draw your nail lines.
-
11th July 2007, 08:21 AM #8
G'day All.
No mainstream flooring manufacturer produces 80mm Top nail T&G anymore. It is all Secret nail. To say" Cramp it" is wrong.. The secret nail profile is designed to be laid with the secret nail gun.
If you cramp and topnail a secret nail profile board, you will fracture the top of groove due to excess pressure being applied via the cramps.
Sure 130mm cover boards can be topnailed. They are designed to be topnailed.
Please. Do your collective selves a favour and download the installation data sheets from www.timber.org.au and enjoy being dragged kicking and screaming into the "new" flooring installation process.
Wongo. be careful. there is a lot of misinformation floating around out there.
Why not PM Dusty or Larry McCully. they do it for a crust and know all the ins and outs.Hooroo.
Regards, Trevor
Grafton
-
11th July 2007, 08:46 AM #9
Which reminds me.
I also used small pieces of cutoff between the leverage I was using and the boards to as not to dent the tongue/groove on the board.
And where I couldn't get enough leverage then I used the wedge method described by Fuzzie.
I did look at clamping the floor, but the joists were too wide to fix the clamps to, and at the end of the day they weren't needed - in most cases just a tap with a hammer was enough - it was only on the odd occassion that I needed to apply serious pressure to the boards.
And for the record, Studley boards are kild dried and treated.There was a young boy called Wyatt
Who was awfully quiet
And then one day
He faded away
Because he overused White
Floorsanding in Canberra and Albury.....
-
11th July 2007, 02:44 PM #10Intermediate Member
- Join Date
- Jan 2007
- Location
- gisborne,vic
- Posts
- 20
Been there, done that!
G'day Wongo,
Having layed a few m2's over the years, these are my recommendations. Upto 90mm boards to secretnail(Aus standard) or as you wish in a top nail version. Help yourself by getting e/m and s/n (end matched and secret nailed), no cutting over joists or pre drilling, nailing, punching and puttying thousands of nail holes(not to mention looking at them for ever).
1: Straighten all your joists
2: Stack all the boards (one layer north/south and the next east/west) with gaps inbetween so they can aclimatise.
3: LEAVE THEM FOR 14 DAYS !!!!!!!So they can aclimatise.
THE FUN BIT!!!!!!!
4se a string line 10 mm away from your longest straight wall(from end to end) to use as a guide for your first board (must be suuuuppppeeeerrrr straight) or you will have wonkey boards throughout.
5: DO NOT USE LIQUID NAILS AS THAT WILL GO HARD AND CREAK IN TIME, YOU NEED TO BUY FLOORING GLUE IN A "SAUSAGE" FROM ANY DECENT HARDWARE!!!!!!
6: Lay your first board "top nailed" as to hold it down in a straight line, don't forget to use glue.
7:From here on in you can lay 1 row at a time and secret nail it down and within a few rows, you will be a wiz at it , it may also help to have a second person to handle and fit the boards into position.
8on't put 2 joints next to each other inbetween side by side joists as they will creak almost immediately.
As much as i have been quick to explaine my experience, a lot of it should be self explained once you get going.
Best of luck, Jason.
-
11th July 2007, 03:33 PM #11
Thanks guys. You have been very helpful.
Jason, is it OK to secret-nail every row?
I am actually a bit nervous. It is one of those “Just do it Wongo” things I suppose.Visit my website at www.myFineWoodWork.com
-
11th July 2007, 07:56 PM #12
-
12th July 2007, 03:40 PM #13Intermediate Member
- Join Date
- Jan 2007
- Location
- gisborne,vic
- Posts
- 20
G'day again,
Only the first board needs to be top nailed (providing you're using boards under 90mm in width), and the secret nailer can be use all the way through except the last couple of boards up against the plaster (if fitted) where you still secret nail but by hand with a 50mm bullet head nail.
Good luck,
Jason.
-
7th August 2007, 12:31 PM #14
I used the long weekend (Monday Bank holiday ) to do the floor. As usually the job is always 10 harder than expected.
I started early on Saturday. ME and my FIL pulled old chipboard out, removed the nails and by lunch time we were ready to lay the floor boards.
Getting the good bits out of the 2 cubes of Studley hardwood floor was a challenge. I inspected every board, 1 by 1, and was lucky to have enough to cover 20m square.
It was 3 days of hard work. I am glad that it was done on time. I don’t know how but we did it.
I would like to think Gareth (Gaza) who kindly lend me his nail gun. Thanks mate.Visit my website at www.myFineWoodWork.com
-
7th August 2007, 01:03 PM #15
G'day Wongo.
Mate, looks like you did a good lob.
Good on Gaza for lending you his tools too.
Pic 1 shows the subfloor space.
Just make sure that there is plenty of sub-floor ventilation. If water gets under the floor and can't get out, or if there is no air flow to dry the water, you will have all sorts of problems with cupping and board expansion.
Give Gaza a call and see what he thinks.
Are you going to sand & seal it yourself as well?
Again. Top job. Well done.Hooroo.
Regards, Trevor
Grafton
Similar Threads
-
Advice for laying recycled floor boards??
By Mr Crow Bar in forum FLOORINGReplies: 3Last Post: 18th October 2006, 10:43 PM -
Hardwood floor installers - Melbourne
By Ben (TM) in forum FLOORINGReplies: 3Last Post: 10th July 2006, 04:41 PM -
hardwood floor finishes
By titand in forum FLOORINGReplies: 9Last Post: 15th May 2006, 08:54 PM -
Hardwood Floor Questions
By happydog in forum FLOORINGReplies: 19Last Post: 24th February 2006, 10:27 PM -
hardwood platform floor
By julianx in forum FLOORINGReplies: 6Last Post: 20th July 2003, 11:52 AM
Bookmarks