    Hi Larry

    Thanks for the info but there was no attachment.

    Currently the only machinery I have is a bandsaw, Triton workbench and router table and some moveable benched on wheels so I donlt think the loads will be too much.

  2. #17
    Join Date
    May 2006
    Location
    sydney
    Age
    65
    Posts
    346

    Default

    Hey bro, I am trying to attach the file, but it is 700kb long, and the attachment bit will only take 100 kb. Do you know any other way to attach it.

  3. #18
    Join Date
    May 2006
    Location
    sydney
    Age
    65
    Posts
    346

    Default

    Quote Originally Posted by lateral View Post
    Hi Larry

    Thanks for the info but there was no attachment.

    Currently the only machinery I have is a bandsaw, Triton workbench and router table and some moveable benched on wheels so I donlt think the loads will be too much.
    Then 400 to 450 centers will be fine.

  4. #19
    Join Date
    May 2006
    Location
    Sydney
    Posts
    0

    Default

    Hi Larry

    So that I could get the ball rolling as fast a possible, I decided to get a framing company to make up a number of floor frames in modular form so that all I had to do was to lay them down, bolt them together and level everything correctly.

    Well, I laid them down and have levelled around the outside of all of the "modules" starting from the highest spot of the slab and dyna bolted them to the slab. I used a digital level (these are great!). I have used fibro for the majority of the packing and also used some plastic "wedgies".

    I am pretty sure that I have the levels around the outside correct and now I want to know what is the best way (and hopefully a fast way) to get the levels correct in the centre. Just to remind you, the slab is 6m x 10m and I will be laying 21mm T & G Plywood flooring and I have the joists running along the 6m. I also had the framing company put in noggings. Do I use a string line or some other method?

    Thanks a lot for
    any help you can provide

    Regards
    Greg

Similar Threads

  1. Hole in concrete slab for clothes line
    By Jon in forum LANDSCAPING, GARDENING, OUTDOORS
    Replies: 5
    Last Post: 13th November 2006, 04:58 PM
  2. help needed fitting shower base on concrete slab
    By built4thrashing in forum KITCHENS, BATHROOMS, THEATRES, etc
    Replies: 0
    Last Post: 11th October 2006, 11:28 PM
  3. garage slab concrete - subbase
    By XT4V in forum CONCRETING
    Replies: 34
    Last Post: 1st May 2006, 07:39 AM
  4. Securing joist to concrete slab
    By grob in forum FLOORING, DECKING, STUMPS, etc.
    Replies: 14
    Last Post: 29th June 2003, 10:21 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •