  1. #16
    rrich Guest

    Default

    FWIW, I had a house built on a slab floor. Our pipes ran through the slab and were encased in a neoprene tube (or, excuse the word condom). I was told by the plumber that this was to prevent corosion. The plumber also said that they used soft copper pipes so that there were no soldered joints below the slab.

  2. #17
    Join Date
    Oct 2003
    Location
    Kentucky NSW near Tamworth, Australia
    Age
    86
    Posts
    1,067

    Default

    Quote Originally Posted by Tools View Post
    foam lagging.You can buy it in rolls.

    Tools
    I think you would find that type of lagging would nbe too bulky to be chased into a wall. The prelagged pipe has a lagging that is only about 3 to 4mm thick and is much denser than the after the event lagging.

    Probably the best thing to do would be to get some grey duct tape and wrap the pipe with it.

    Shouldn't take more than an hour to accomplish that.

  3. #18
    Join Date
    Nov 2003
    Location
    Australia and France
    Posts
    2,869

    Default

    Quote Originally Posted by ozwinner View Post
    I think if youse all look he is going to encase it in mortar which a whole lot different to concrete.
    Nearly all concrete contains retarder, which is very corrosive.
    And "nearly" all (depending on your brickie! ) mortar contains cement, which isn't at all corrosive!.

    Sorry Al, I've dug out too many to let you get away with it!


    Cheers,

    P

  4. #19
    Join Date
    Oct 2006
    Location
    Sydney
    Posts
    23

    Default

    Thanks guys,

    Very glad I asked. The foam stuff would be too bulky in what I have chased out in the wall. I'll go to the shops and ask for some thinner stuff this week hopefully.

    I was going to to it this Wednesday when the boy is in day care, but the weather is cooling down enough for a couple hours fishing!!!

  5. #20
    Join Date
    Oct 2003
    Location
    Kentucky NSW near Tamworth, Australia
    Age
    86
    Posts
    1,067

    Default

    Quote Originally Posted by Smiley Guy View Post
    Thanks guys,

    Very glad I asked. The foam stuff would be too bulky in what I have chased out in the wall. I'll go to the shops and ask for some thinner stuff this week hopefully.

    I was going to to it this Wednesday when the boy is in day care, but the weather is cooling down enough for a couple hours fishing!!!
    Like they say work is only for people that don't know how to fish.

  6. #21
    Join Date
    Jan 2007
    Location
    Adelaide - West
    Age
    43
    Posts
    311

    Default

    Hey bloke wrap your pipe in normal grey duct tape, this will work well enough. The new copper pipes are thinner material ( cheap rubbish ) so it will corrode faster than old copper would have. Grey tape will do it, thats what i use, yes im a plumber, just make sure there are no holes in it ( do a good job)

    Lagging will not work as it is porous and will let moisture through.

    When you fill the chase up, try doin the corners on one day and then the next day when its hard you will find it a lot easier to bend the taps into a level position.
    If you dont play it, it's not an instrument!

  7. #22
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    63
    Posts
    2,026

    Default

    Quote Originally Posted by bricks View Post
    ................Lagging will not work as it is porous and will let moisture through.........................
    What, the green plastic lagging that comes on the pipes? (Kemlag) I seriously doubt that.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

  8. #23
    Join Date
    Oct 2003
    Location
    Kentucky NSW near Tamworth, Australia
    Age
    86
    Posts
    1,067

    Default

    Quote Originally Posted by journeyman Mick View Post
    What, the green plastic lagging that comes on the pipes? (Kemlag) I seriously doubt that.

    Mick
    I agree with Mick. I have had Kemlag buried in soil for years and dug it up and the only area where moisture has got in is in the end where the Kemlag is cut and then it it has only gone in by capillary action a couple of inches. Kemlag is a closed cell foam so moisture doesn't penetrate.

    The chances of moisture getting in a pipe that has been rendered in is remote unless the pipe is leaking.

    The corrosion is started by the wet cement coming in contact with the copper and sets up a chemical reaction.

    Like you say bricks grey duct tape will do the job anyway.

  9. #24
    Join Date
    Jan 2007
    Location
    Adelaide - West
    Age
    43
    Posts
    311

    Default

    Sorry Mick but eventually the kemlag will have to come off when it is heated or joined, and i was talking about the black foam insulation that someone suggested re smileys last post, plus you could put your kids through private school for the cost of kemlag.
    If you dont play it, it's not an instrument!

  10. #25
    Join Date
    May 2003
    Location
    Kuranda, paradise, North Qld
    Age
    63
    Posts
    2,026

    Default

    Most of the jobs I've been on Kemlag has been used for all hot water and wherever pipes are chased into the blockwork. Combinations are usually covered in stripped off plastic lagging if it's around and any bare bits or joints etc are covered in duct tape. I reckon that by the time you factor in the labour component to wrap bare copper in tape then it's more expensive not to use kemlag. Wasting dollars to save cents, I reckon.

    Mick
    "If you need a machine today and don't buy it,

    tomorrow you will have paid for it and not have it."

    - Henry Ford 1938

Similar Threads

  1. deck ontop of concrete steps
    By oricenap in forum CONCRETING
    Replies: 2
    Last Post: 25th June 2007, 09:25 PM
  2. Some hotwater pipes are not copper. Is it right?
    By Jessie in forum PLUMBING, ELECTRICAL, HEATING, COOLING, etc
    Replies: 54
    Last Post: 15th February 2007, 07:49 PM
  3. How to concrete posts/brackets into place?
    By ptyltd in forum CONCRETING
    Replies: 5
    Last Post: 20th January 2006, 01:07 PM
  4. Concrete Footings...Is there a better way?
    By Flyboy in forum CONCRETING
    Replies: 38
    Last Post: 4th September 2005, 06:19 PM
  5. Concrete over concrete
    By Sir Stinkalot in forum CONCRETING
    Replies: 4
    Last Post: 18th July 2003, 10:59 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •