Page 3 of 3 FirstFirst 123
Results 31 to 36 of 36
  1. #31
    Join Date
    Apr 2005
    Location
    Sydney
    Age
    64
    Posts
    882

    Default

    Quote Originally Posted by willingbark View Post
    Try looking on the web for software called 'Timber solutions' , put out by FWPRDC. cheers
    Wow, that's a pretty comprehensive set of span tables. That takes care of everything you'd need to specify.

    Thanks for the heads up willingbark.


  2. #32
    Join Date
    Jul 2005
    Location
    Posts
    38

    Default

    Quote Originally Posted by chanquetas View Post
    Duckman I did say I was going to overengineer it. I think 600mm is too big.
    How do you "overengineer" something if you dont know how to "engineer" it in the first place.

  3. #33
    Join Date
    Apr 2005
    Location
    Sydney
    Age
    64
    Posts
    882

    Default

    To an optimist the glass is half full.
    To a pessimist the glass is half empty.
    To an engineer it's designed just right, having a 2:1 safety margin.


  4. #34
    Join Date
    May 2004
    Location
    Melbourne, Australia
    Posts
    0

    Default

    Quote Originally Posted by pawnhead View Post
    To an engineer it's designed just right, having a 2:1 safety margin.
    I thought it was:

    To an engineer the glass is twice as big as it needs to be.

  5. #35
    Join Date
    Dec 2005
    Location
    Tolga, Qld
    Posts
    49

    Default

    Hi All.
    Have been following this thread with interest as I also believe that Standards Australia overcharge.
    Some time back ther was an analogy drawn with AMSA's Marine Orders and Duckman commented to the effect that this was not a true analagy as Australian Standards are produced by scientists, engineers and "other professionals".
    Before I retired I was heavily involved in the drawing up of the National Standard for Commercial Vessels, which is the State and Territory equivalent of Marine Orders, and I can assure Duckman that both Marine Orders and the NSCV involved, and still do involve, a vast amount of work by very professional people in the maritime industry. This work in addition to their normal workload and is unpaid.

    While I am not decrying Standards Australia, I still reckon that they are far too expensive.

    Bill

  6. #36
    Join Date
    Apr 2005
    Location
    Sydney
    Age
    64
    Posts
    882

    Default

    Quote Originally Posted by Feralbilly View Post
    While I am not decrying Standards Australia, I still reckon that they are far too expensive.

    Bill
    That program posted by willingbark is extremely comprehensive, dealing with every condition imaginable in Australia. However it's also very difficult to use if you're just looking for something more general. Here's a few other links that I picked up browsing these forums: -

    DPR Span Tables, http://www.fordtimbers.com.au/dpr_span_tables.htm

    Hyne, http://www.hyne.com.au/pagefiles/spantables.htm

    Futurebuild, (Hyjoist, Hybeam, Hyspan, Hychord, LVL beams) http://www.chhfuturebuild.com/WSMApa...0209-1,00.html


Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •