    Default Solid Timber onto concrete

    Hi

    I was told by supplier that a 5" solid new oak t&g board can go straight onto a recently poured (4 months ago) concrete ground floor

    He said Soudal do a glue that goes between.

    Would water from the concrete be an issue?

    Can anyone help?

    Thanks

    Michael
    Dublin
    Ireland

  2. #2
    Join Date
    Apr 2006
    Location
    Launceston
    Posts
    30

    Default

    Sika do one too. In tubs and sausages. 4 months should be long enough.

  3. #3
    Join Date
    Oct 2006
    Location
    Australia
    Posts
    14

    Post another

    also bostic ultraset (think it has been renamed) is another cheaper but highly recommended one. they also have a moisture barrier sealer to apply first.

    crow man.

  4. #4
    Join Date
    Jun 2004
    Location
    Grafton, N.S.W.
    Age
    64
    Posts
    546

    Default

    G'day.
    A new timber floor over a 4 month old slab?
    NO BLOODY WAY!!!

    Allow roughly 1 month per 1" of slab thickness.
    Consider surounding soil types that can cause retained moisture in the slab.

    Use spreadable vapour barrier then sheet off with plastic sheet with taped joints. Bring sheet up the walls 50mm.
    Then lay minimum 15mm ply fixed into the slab with plitz anchors.
    Glue and nail in the normal manner.

    I'm sure that the TRADA website in Pommy land would have relevant flooring info for installations for the UK region.

    Have a look.
    Hooroo.
    Regards, Trevor
    Grafton

  5. #5
    Join Date
    Nov 2004
    Location
    Robertson, New South Wales
    Posts
    27

    Default

    Dear Micheal-just a note to say how good it is to hear from someone in Dub.
    Any advice on dampness and flooring from this dry part of the world will need to be taken as from almost a different planet. What part of Dublin? I used life in Phibsborough and worked at St Pats in Drumcondra. In those days a pint was 20p in Dublin and 18p down the country.
    Slan-Michael Ban

  6. #6
    Join Date
    Jul 2005
    Location
    North Tas
    Posts
    18

    Default

    1" per month on a 100mm/4" slab = dry enough, doesn't it?
    Old Codger lays alot of those floors on concrete, he should know.
    Scotty

Similar Threads

  1. How to concrete posts/brackets into place?
    By ptyltd in forum CONCRETING
    Replies: 5
    Last Post: 20th January 2006, 01:07 PM
  2. Deceptive timber
    By Suresh in forum HAVE YOUR SAY
    Replies: 1
    Last Post: 17th September 2005, 12:42 AM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •