    Default decking over pavers

    looking at putting decking directly over existing pavers. Pavers are uneven. size 9mtr x 4mtr. Or am I better off removing all pavers and levelling..?

  2. #2
    Join Date
    Jul 2006
    Location
    brisbane
    Posts
    2

    Default

    jhgk

  3. #3
    Join Date
    May 2006
    Location
    sydney
    Age
    65
    Posts
    346

    Default

    I recon to get the best performance and results, you will need to put in bearers and joist to be able to support the deck boards anyway, so remove all pavers and that willgive you the ability to excavate down the depth needed to install the bearers on piers and then the joist and then the deck, their mabe a minimum clearence between timber and groundthat is needed for water drainage, i am sure that some of the other gentleman on this fourum who are chippies know all of this and can help you .

  4. #4
    Join Date
    Jul 2005
    Location
    Ipswich QLD
    Age
    55
    Posts
    177

    Default Decking over pavers

    Johnsy, i belive that Larry is right and you need to rip up the pavers excavate it out and then start from scratch. It seems the simplist method to save any issues down the track.
    Dave,
    hug the tree before you start the chainsaw.

  5. #5
    Join Date
    Jun 2004
    Location
    Canberra
    Age
    45
    Posts
    314

    Default

    Are you installing decking a reasonable distance above ground level? Ie on posts then Bearers/joists etc?

    If you are there is no reason you need to remove the pavers if you dont want to IMO.

    Just remove the pavers where you need to dig the post holes.

    I have done exactly this and it work beautifully. Pics below if they help

    Different story if you are placing decking at ground level (which I wouldnt do anyway..... )

    Cheers Joel











    I want to die peacefully in my sleep like my grandfather, not screaming in terror like the passengers in his car.

  6. #6
    Join Date
    Apr 2006
    Location
    Hobart
    Posts
    126

    Default

    Quote Originally Posted by johnsy
    looking at putting decking directly over existing pavers. Pavers are uneven. size 9mtr x 4mtr. Or am I better off removing all pavers and levelling..?

    Johnsy, I think it all depends on how far above the pavers you want to put the decking.

    Wooden decking must be clear of the ground, and remain clear even if there is a build up of dirt, etc, otherwise it will eventually rot quite quickly. Also will you need future access under the deck?

    Its much easier to remove the pavers, and possibly excavate before you build the deck, than after. But if the deck is well clear of the ground, why bother?

    When we did our treated pine deck fifteen years ago, the council insisted on 6mm gaps between the boards. The boards shrunk in situe and the gaps are now 15-17mm. Pine shrinks a lot in the weather.

    Cheers

    Graeme

  7. #7
    Join Date
    Jun 2003
    Location
    brisbane
    Posts
    200

    Default

    clearance between the ground and the underside of the timber needs to be 150mm minimum

Similar Threads

  1. Acceptable level of broken pavers?
    By Sir Stinkalot in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etc
    Replies: 19
    Last Post: 12th April 2006, 09:34 PM
  2. Steps from deck onto pavers.
    By Sir Stinkalot in forum BRICKWORK, CONCRETING, PAVING, RENDERING, etc
    Replies: 7
    Last Post: 1st April 2006, 11:33 AM
  3. Feedback on decking project
    By nmilne in forum FLOORING, DECKING, STUMPS, etc.
    Replies: 6
    Last Post: 9th January 2006, 10:44 AM
  4. Organoil Decking Oil
    By roxmagsplit in forum FINISHING
    Replies: 3
    Last Post: 11th September 2005, 10:26 PM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •