    Default gatic required for cross over

    hi all. at the front of my property (that was sub divided), there is a stormwater drain junction pit.

    I have been dealing with council regarding the issue and have come to a 99% agreement with both myself and council.

    The general idea is to incorporate a single part gatic access cover that will be concrete filled, over the pit and incorporate it into the cross over.

    Refer to: http://esvc000657.wic021u.server-web...atic/1part.pdf

    How many people have had experience with installing gatics within cross overs? Is there anything I need to look out for/be aware of?

  2. #2
    Join Date
    Aug 2005
    Location
    Victoria
    Posts
    412

    Default

    One tip...make sure the lid is installed and pour the whole lot in one hit.Don't take the lid out thinking it will be easier or neater.

    Tools

  3. #3
    Join Date
    Mar 2006
    Location
    0.0.0.0
    Posts
    38

    Default

    thanks for the reply, looks like not many people have had experience with them.

    Tools, how many have you installed? The current pit is at the kerb height, so it will need to be cut down to the height of the cross over (100mm lower give or take). Is it a hard thing to do?

  4. #4
    Join Date
    Apr 2006
    Location
    Melbourne
    Posts
    9

    Default

    Gday

    The gatic should be sitting on a concrete pit. So you'll need to cut the pit down to the required height using a demo saw.

    If you've never used one before they can be quite tricky!! Alternatively you could use a grinder with a diamond blade. It might take a bit longer but, should be a bit easier.

    Cheers

    KeepaTalk

  5. #5
    Join Date
    Feb 2006
    Location
    Vic
    Posts
    24

    Default

    Shop around, for the gatic lid too, because in melbourne there are a few different manufacturers, and prices can vary. Gatic is a brand name, but tends to get used as a generic description (like Stackhat for bike helmets).

    If you are mucking around with lowering the pit height, is the pit already in the ground? if so, maybe its easier to use an electric jackhammer to break down the pit walls to the right height. Noisier and messier, and leaves an uneven top which would need to be grouted up to make a level seat for the pit lid, but could be a less frightening prospect than jumping down into a stormwater pit and swinging a petrol demo saw (or a 9" grinder) that can seriously bite you if you dont cut straight.
    Young kids cancels shed time

  6. #6
    Join Date
    Mar 2006
    Location
    0.0.0.0
    Posts
    38

    Default

    the pit is already in the nature strip. it is a storm water junction, so it looks like the kerb side drain where water runs into, but there is no kerb drain, just the lid on the pit sitting in the nature strip.

    I am pretty keen at giving things a go, but this seems a bit out of my league.

    Might have to get someone to quote on the whole job, gatic/grate, excavation and cross over

Similar Threads

  1. People Power Required
    By rod1949 in forum NOTHING AT ALL TO DO WITH RENOVATION
    Replies: 60
    Last Post: 17th April 2005, 01:14 PM
  2. Timber size required vs span
    By CraigV in forum FLOORING, DECKING, STUMPS, etc.
    Replies: 11
    Last Post: 15th February 2005, 10:26 AM

Tags for this Thread

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •