Results 1 to 8 of 8
Thread: fixing timber to tiles????
-
9th January 2006, 11:47 PM #1New Member
- Join Date
- Nov 2005
- Location
- melbourne
- Posts
- 8
fixing timber to tiles????
Hi All!! i have to pack out a tiled shower wall (2 of) with one needing about 85mm!:eek: to meet the new shower base. any ideas on fixing timber " battens " to previously tiled walls would be appreciated. Cheers!
life is like a &&&& sandwich, the more bread you have , the less &&&& you have to eat!
-
10th January 2006, 12:01 AM #2
If they're timber framed walls, you're better off removing the tiles/lining and just packing out the existing studs & noggins.
- Andy Mc
-
10th January 2006, 08:31 AM #3
If it's double brick or other masonry, you could use rawl plugs and screws.
"I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
10th January 2006, 08:37 AM #4
Actually, I've changed my mind. If you're going to hang villaboard or something on it and tile it, you'd be better to use some sort of dynabolt - you can get them with countersunk heads.
That is if it's masonry. If it's timber frame, go with Skewy."I don't practice what I preach because I'm not the kind of person I'm preaching to."
-
10th January 2006, 08:55 PM #5New Member
- Join Date
- Nov 2005
- Location
- melbourne
- Posts
- 8
thanx for the advice all. timber not masonry, was hoping to avoid pulling it all off, may be i have to but did try sticking a pine offcut to the face of a tile as a test overnight and it has well and truly GRABBED ! any probs with this simple method???? cheers!!
-
10th January 2006, 10:06 PM #6
For any other room you could conceivably get away with it. But for a wet-area, well... trust me, it really isn't a good idea. It'll probably cost you in the long run.
Why?
One problem with gluing timber to masonry (or tiles, etc) is that timber shrinks/expands with temperature & humidity. So does the masonry, but to a lesser degree. Sooner or later, the glue will fail.
Also, if you go ahead with your method, you'd best be damned sure it's water-proof 'cos the "old" tiles will act as a water-barrier and should any moisture get under the new 'uns it'll be trapped... which certainly won't do your battens any good. Wet rot.
Whether you strip the old tiles or not, to do a reasonable job, you'll also have to pull up the closest row(s) of tiles from the other walls & floor, the ones' closest to the wall your moving. At minimum you need to run a strip of water-proofing (usually aluminium angle) in the wall/floor junctions, before relaying the tiles over the top.
So, if you're going to be pulling up tiles anyway...
- Andy Mc
-
10th January 2006, 10:33 PM #7New Member
- Join Date
- Nov 2005
- Location
- melbourne
- Posts
- 8
thanx for your learned advice, guess its the hard road for me! :eek: cheers!
-
11th January 2006, 08:35 AM #8Sooner or later, the glue will fail.
The sledgehammer is your friend"I don't practice what I preach because I'm not the kind of person I'm preaching to."
Similar Threads
-
floating timber flooring over ceramic tiles
By mickey_E in forum FLOORINGReplies: 7Last Post: 4th October 2005, 02:08 PM -
Deceptive timber
By Suresh in forum HAVE YOUR SAYReplies: 1Last Post: 17th September 2005, 12:42 AM -
Fixing Tiles over Waterproofing Membrane System
By GeoffVIC in forum TILINGReplies: 2Last Post: 30th May 2004, 09:25 AM -
Fixing diagonal timber braces to concrete stumps?
By Eastie in forum FLOORING, DECKING, STUMPS, etc.Replies: 16Last Post: 9th May 2004, 10:35 PM
Bookmarks