Thanks Thanks:  0
Likes Likes:  1
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 3 of 3
  1. #1
    Join Date
    Apr 2015
    Location
    Newcastle, NSW, Australia
    Posts
    20

    Default bathroom screed before or after wall frames

    Renovating a house that had termite damage so reframing the house, planning on bathroom floor with micro-cement. Does one screed before frames are stood or after?

  2. #2
    Join Date
    Apr 2018
    Location
    Nsw
    Age
    64
    Posts
    1,343

    Default

    After, otherwise you will need to cut your wall frames to suit the fall to get them level. You also typically screed after the wall linings are installed with waterproofing done first but can be after as well

  3. #3
    Join Date
    Apr 2015
    Location
    Newcastle, NSW, Australia
    Posts
    20

    Default

    Thanks Beardy. 🍻

Similar Threads

  1. Removing bathroom floor & screed
    By Bearman in forum BATHROOM & TOILET
    Replies: 6
    Last Post: 10th March 2008, 02:23 PM
  2. bathroom floor screed
    By cabman in forum PAINTING, PLASTERING, TILING, DECORATING, etc.
    Replies: 1
    Last Post: 5th December 2007, 08:13 AM
  3. Does screed needed for the bathroom floor?
    By tiant in forum KITCHENS, BATHROOMS, THEATRES, etc
    Replies: 2
    Last Post: 29th November 2006, 09:13 AM
  4. Help!! screed bathroom floor
    By danger005 in forum KITCHENS, BATHROOMS, THEATRES, etc
    Replies: 8
    Last Post: 13th September 2006, 04:17 PM
  5. dilemna re bathroom floor screed removal
    By samhorr in forum KITCHENS, BATHROOMS, THEATRES, etc
    Replies: 1
    Last Post: 22nd August 2006, 11:33 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •