Thanks Thanks:  0
Likes Likes:  0
Needs Pictures Needs Pictures:  0
Picture(s) thanks Picture(s) thanks:  0
Results 1 to 8 of 8
  1. #1
    Join Date
    Jun 2004
    Location
    Port Macquarie
    Age
    55
    Posts
    648

    Default Dodgy Pier under the house

    I've noticed a slight dip in my floor and after a quick peak under the house have discovered a gap of about 60mm between a pier in the approximate area and the floor joist.

    I've never touched anything like this before so advice on fixing it up very welcome. I'm sure I saw somewhere a guys jack up the floor far enough to get additional bricks in, is this a good / bad idea? I have a Blue Gum floor above and I don't want to damage it.

    HH.
    Always look on the bright side...

  2. #2
    Join Date
    Oct 2002
    Location
    Tin Can Bay, Queensland, Australia
    Age
    72
    Posts
    64

    Default

    HH

    In general what you say is correct however to have a gap of 60mm is pretty severe. Can you determine what has happen with the pier? Is it dropping in to the ground or has there been a packing come off the top of it.? :confused:

    Jamie
    Perhaps it is better to be irresponsible and right, than to be responsible and wrong.
    Winston Churchill

  3. #3
    Join Date
    Jun 2004
    Location
    Port Macquarie
    Age
    55
    Posts
    648

    Default

    My guess is that it was loose due to movement in the floor and the plumber who fitted my kitchen about 12 months ago has knocked into it and not told me.

    I've also heard of wedges you can use for the last inch or so anyone know if these exist?

    HH.
    Always look on the bright side...

  4. #4
    Join Date
    Feb 2002
    Location
    Palm Beach Gold Coast
    Age
    64
    Posts
    30

    Default

    Hi HH, We had a similar problem at our place a couple of years ago

    What I did was got a car jack, put some flat wood on the ground, so that the jack doesnt sink into the ground, and jack up till level.

    I used pine wedges, that we made our selfs, the ones that you use to get door frames straight.

    Being 60mm out you will have to use a spacer first then place the wedges in util the correct level.

    Get your better half with a level to keep yelling at you when it is level

    Hope this helps and hope it makes sense

    Thommo

  5. #5
    Join Date
    Oct 2002
    Location
    Tin Can Bay, Queensland, Australia
    Age
    72
    Posts
    64

    Default

    HH

    I'd get a straight edge long enough to span the distance between existing piers that are bearing weight then get a jack to lift the joist right next to the dodgy pier. You should find you can get the straight edge flat on the floor.
    Measure the gap you've then got between pier and joist and cut a hardwood block to go under the joist. Make it significantly wider than the joist, to span the top of the pier and a tight fit so it won't quite go in say 1-2mm over size. Give the jack another lift to get the block in, centered under the joist length ways and then let the jack go. All should be hunky dory.

    Check it again down the track a while to make sure everything is still good and tight. If it ain't I'd start to check the footing of the pier

    I've restumped a couple of places - the first with a professional (very tight access), the second myself (sandy soil and more room).
    The above is based on that experience and I assume all your other piers are sound and not in need of replacement.

    FWIW

    Jamie
    Perhaps it is better to be irresponsible and right, than to be responsible and wrong.
    Winston Churchill

  6. #6
    Join Date
    Jun 2004
    Location
    Port Macquarie
    Age
    55
    Posts
    648

    Default

    Thanks a lot both of you I'll give it a go this weekend and let you know how I go.

    HH.
    Always look on the bright side...

  7. #7
    Join Date
    Feb 2002
    Location
    Palm Beach Gold Coast
    Age
    64
    Posts
    30

    Default

    Hi Happyhammer, was just gong thru some old threads and came across this and was wondering how it all went in the end.


    Cheers Thommo

  8. #8
    Join Date
    Jun 2004
    Location
    Port Macquarie
    Age
    55
    Posts
    648

    Default

    I sold the house and moved up the coast and didn't bother to do anything about it.

    HH.
    Always look on the bright side...

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •