Hey guys, chasing opinions on correct tiedown procedures when changing from cement tiles to colorbond. Have had a read of the AS 1684, and it's not throwing up anything crazy. Triple grip to rafter/top plate, bolt through the collar tie and a length of strap brace over the top of the ridge down the rafters. I'm also assuming i'll need diagonal bracing but i can't find any info on that yet.

The surveyor has said to do a small section and he'll have a look at one of the first inspections at my work and let me know if i need to do more.

Had a search and can't see any treads on it, so any info would be great from someone who's done it or had it done.

Cheers in advance.


Read the full thread at RenovateForum.com...