Has anyone shifted a 6m x 6m shed?
We bought a house with a 6m x 6m x 2.7m Titan shed that is built over the septic system. We want to move the shed back 3m, this will put the septic just out side the front of the shed, then we'll be able to concrete the floor to make better use of it.
It has double roller doors at the front and personnel door and a window at the rear, bolted to 8 footings.
If we concreted 3 new footings 3m out the back of the shed and 1 in the centre, is it possible to crane lift the shed, move it the 3m back, and reconnect in the new position? then slab...
Or would it be cheaper to dismantle and slab and reconstruct?
Any other ideas welcome, anyone tried the crane idea?