Hi
I have a small bathroom i need to prepare for tiling

Can you look at the photos i have supplied and suggest the best approach for the floor area outside the shower

I cannot understand how this is going to work...

I have set that floor waste 20mm lower than the top of the shower angle
But in order to slope all areas of the room toward the floor waste
It will make my floor steeper than the Himalayas in some areas...
Especially along the wall behind the floor waste
And at the corner of the shower
where opposite ends of the room are coming together........

Ive never done tiling b4 but sitting back looking at it...
this seems impossible?

I am using a 200x200 ceramic tile

It was suggested in another forum to set a level floor
With the waste only a 5mm lower than the highest point
And just set the perimeter tiles to that angle
Then the rest of the floor is level?

This would look so much beter...

Most of the water should only be coming from the shower area anyway
Which is stepped down inside the angle 20mm

But if i set a level floor im worried that wil be the wrong thing to do
And if i set the screed so everything is sloping the way it should
I just cant see how thats even possible to make the tiles look flat

What to do...

Any advice apreciated